Published May 15, 2026 at 8:00 PM

Updated May 16, 2026

Site work for a civil project in Debary, Florida. Completed plans call for site work for a water / sewer project.

The project consists of constructing a new two-million-gallon potable water storage tank, a high-service pump station, and a combined electrical/it/chemical storage building. Work includes all associated civil site development, concrete foundations, mechanical systems, electrical and instrumentation installations, and integration of all components in full compliance with volusia county utilities standards and all applicable permit requirements. The completed project will enhance system capacity, improve operational reliability, and support long-term potable water service needs for the county's southwest service area. Confidential information and infringement. If contractor is licensing, or developing software (including derivative works) for use by the county, contractor grants county a perpetual, fully-paid, non-assignable, non-exclusive, royalty-free license to use contractor's software deliverables developed or licensed under a contract. Said license includes software owned by contractor which is furnished under a contract, for county's internal use with such use to include the right to modify such deliverable(s) and to create derivative works for such internal use including without limitation the right to use such deliverable(s). If contractor is licensing, providing or developing software, including derivative works for use by the county, contractor agrees to protect and indemnify and hold harmless the county, its agents, elected officials and employees of the county from and against any and all claims, demands, actions, and causes of action which may arise asserting that all or any part of the contractorlicensed applications provided under any software owned by contractor and licensed to county or provided by contractor for use thereof by the county, infringes or misappropriates any third party's United States patent, copyright or any trade secret protected under United States law. In addition to the foregoing indemnification provision, contractor shall also take the following steps to assure that county can continually use the software which contractor has directly licensed to county or provided for use thereof by the county in substantially the same manner delivered or subsequently enhanced or modified by: Promptly replace the allegedly infringing or misappropriated item or items with compatible, functionally equivalent itemswhich are not alleged to be infringing or misappropriated; or Promptly modify the alleged infringing or misappropriated item or items to eliminate the alleged infringement or misappropriation without impairing county's intended use of the licensed applications and/or sublicensed applications in any manner; or Promptly procure the right for the county to continue to use the licensed applications and/or sublicensed applications without modification; and Unless otherwise agreed by the parties, promptly shall mean for the purposes of this section that the events described herein shall occur in no less than sixty (60) days from the date that notice of the claim is received by contractor unless otherwise agreed by the parties. Question submission deadline:may 28, 2026, 11:59pm Substantial completion is five hundred (500) days Final completion is five hundred-thirty (530) days The respondent to whom a contract is awarded will be required to execute the prescribed contract and payment and performance bond, if required, within ten (10) business days from the date of notice of award of the respondent's proposal. A response may be withdrawn I) prior to the solicitation opening via online or ii) after one hundred twenty (120) days from solicitation opening. In the second instance ('ii'), this only applies to respondents notified by the county in letter form that their response will not be accepted. Unless otherwise stated in the special terms and conditions section, the county will remit full payment on all undisputed invoices for goods and services other than construction services within forty-five (45) days from receipt by the appropriate person(s) (to be designated at time of agreement) of the correct invoice(s) or receipt of all products or services ordered in accordance with f.S.S. 218.74. For construction services the county will remit full payment on all undisputed invoices within twenty (20) to twenty-five (25) days in accordance with f.S.S. 218.735. The county of volusia reserves the right to reject offers containing terms or conditions contradictory to those requested in this solicitation.

GC Bidding

Water / Sewer

$15,000,000.00

Public - County

Site Work

99

26

2

Subscribe For Documents

51 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
357
Active Projects
147
Bidding Soon
1,883
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 11, 2026

August 10, 2026

Project location map

798 Fort Florida Rd, Debary, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.