Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 15, 2026 at 8:00 PM
Updated May 16, 2026
Site work for a civil project in Debary, Florida. Completed plans call for site work for a water / sewer project.
The project consists of constructing a new two-million-gallon potable water storage tank, a high-service pump station, and a combined electrical/it/chemical storage building. Work includes all associated civil site development, concrete foundations, mechanical systems, electrical and instrumentation installations, and integration of all components in full compliance with volusia county utilities standards and all applicable permit requirements. The completed project will enhance system capacity, improve operational reliability, and support long-term potable water service needs for the county's southwest service area. Confidential information and infringement. If contractor is licensing, or developing software (including derivative works) for use by the county, contractor grants county a perpetual, fully-paid, non-assignable, non-exclusive, royalty-free license to use contractor's software deliverables developed or licensed under a contract. Said license includes software owned by contractor which is furnished under a contract, for county's internal use with such use to include the right to modify such deliverable(s) and to create derivative works for such internal use including without limitation the right to use such deliverable(s). If contractor is licensing, providing or developing software, including derivative works for use by the county, contractor agrees to protect and indemnify and hold harmless the county, its agents, elected officials and employees of the county from and against any and all claims, demands, actions, and causes of action which may arise asserting that all or any part of the contractorlicensed applications provided under any software owned by contractor and licensed to county or provided by contractor for use thereof by the county, infringes or misappropriates any third party's United States patent, copyright or any trade secret protected under United States law. In addition to the foregoing indemnification provision, contractor shall also take the following steps to assure that county can continually use the software which contractor has directly licensed to county or provided for use thereof by the county in substantially the same manner delivered or subsequently enhanced or modified by: Promptly replace the allegedly infringing or misappropriated item or items with compatible, functionally equivalent itemswhich are not alleged to be infringing or misappropriated; or Promptly modify the alleged infringing or misappropriated item or items to eliminate the alleged infringement or misappropriation without impairing county's intended use of the licensed applications and/or sublicensed applications in any manner; or Promptly procure the right for the county to continue to use the licensed applications and/or sublicensed applications without modification; and Unless otherwise agreed by the parties, promptly shall mean for the purposes of this section that the events described herein shall occur in no less than sixty (60) days from the date that notice of the claim is received by contractor unless otherwise agreed by the parties. Question submission deadline:may 28, 2026, 11:59pm Substantial completion is five hundred (500) days Final completion is five hundred-thirty (530) days The respondent to whom a contract is awarded will be required to execute the prescribed contract and payment and performance bond, if required, within ten (10) business days from the date of notice of award of the respondent's proposal. A response may be withdrawn I) prior to the solicitation opening via online or ii) after one hundred twenty (120) days from solicitation opening. In the second instance ('ii'), this only applies to respondents notified by the county in letter form that their response will not be accepted. Unless otherwise stated in the special terms and conditions section, the county will remit full payment on all undisputed invoices for goods and services other than construction services within forty-five (45) days from receipt by the appropriate person(s) (to be designated at time of agreement) of the correct invoice(s) or receipt of all products or services ordered in accordance with f.S.S. 218.74. For construction services the county will remit full payment on all undisputed invoices within twenty (20) to twenty-five (25) days in accordance with f.S.S. 218.735. The county of volusia reserves the right to reject offers containing terms or conditions contradictory to those requested in this solicitation.
GC Bidding
Water / Sewer
$15,000,000.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 11, 2026
August 10, 2026
798 Fort Florida Rd, Debary, FL
Related To This Project
Debary, FL
--
Debary, FL
Bid Date: May 04 2026
Debary, FL
Bid Date: Mar 04 2026
Debary, FL
--
Debary, FL
Bid Date: Dec 15 2025
Debary, FL
Bid Date: Nov 18 2025
Debary, FL
Bid Date: Dec 02 2025
Debary, FL
Bid Date: Oct 30 2025
Debary, FL
Bid Date: Oct 24 2025
Debary, FL
Bid Date: Nov 20 2025
Debary, FL
Bid Date: Aug 26 2025
Debary, FL
Bid Date: Sep 25 2025
Debary, FL
Bid Date: Sep 12 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
