Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 14, 2026 at 8:00 PM
Updated May 16, 2026
Site work and new construction of a mixed-use development in Seattle, Washington. Completed plans call for the construction of a educational facility.
Design, Engineer, Permit and Installation of an approximately 466 KW photovoltaic array in order for the project to become a net zero system. The existing project infrastructure includes: a. Roof stanchions on all roofing systems to allow for steel super structure installation, no ballasted systems are allowed. b. Electrical penetrations provided in several locations at the roof, no penetration of the existing roof is allowed. c. Electrical room, space for inverters and other gear has been accounted for within the space per the code. Design team to verify current conditions based on updated code requirement, no adjustments to existing walls allowed. Budget: $1,700,000, including design, engineering, permitting, installation, and misc costs. May 7, 2026 Last Day for Questions from proposers by 2:00 p.m. PST The Seattle School District No.1 (District) is requesting proposals for design, engineering, permitting and installation of an approximately 466KW Photovoltaic array for John Rogers Elementary.
GC Bidding
Solar Power Generation
$1,700,000.00
Public - City
New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
4
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 18, 2026
June 12, 2026
To Be Determined, Seattle, WA
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
