BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 26, 2026 at 8:00 PM

Updated May 27, 2026

Site work for a civil project in Paul, Idaho. Completed plans call for site work for a water / sewer project.

The critical purpose of the proposed Project is to construct approximately nine (9) miles of pressurized fused HDPE pipe, with pipe sizes ranging from 54-inches at the pump station down to 14-inches at the end. Work shall include installation of required fittings, valves, combination vacuum-air relief valves, pressure relief valves, drainage sumps, and all other appurtenances associated with the pressurized pipeline. There are up to sixteen separate turnouts along the pressurized pipeline that will connect to existing pressurized irrigation systems, ponds or injection wells. The ponds and injection wells are not part of this project. Construction of the pipeline will be along existing public roads, private roads, private property, and a conservation easement. The pipeline does not pass through any of the local cities. Connection to the pump station (constructed by others) will require connection to a 54-inch HDPE pipe installed as part of the pump station. The work includes soil excavation, rock excavation, and removal for pipeline construction; installation of fused HDPE pipe of various sizes ranging from 54-inches to 14-inches; installation of fused HDPE fittings, appurtenant valves, meters, combination air vacuum valves, pressure relief valves, and drainage sumps outlets; site restoration along pipeline; installation of turnout facilities; site improvements and grading for access and ongoing maintenance; and coordination with SCADA subcontractor associated with the pump station for SCADA required at each turnout. The estimated cost of construction is between $18-21 million dollars. The proposed period for bidding, awarding, and construction of the project is June 2026 through June 2027. A key milestone for the project is that the system must be able to deliver water by mid-May 2027. Questions Due: Friday, May 15, 2026, at 5:00 PM MDT Question Response: Tuesday, May 18, 2026, at 2:00 PM MDT

Post-Bid

Water / Sewer

$21,000,000.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
19
Active Projects
10
Bidding Soon
144
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 22, 2026

June 1, 2026

Project location map

Multiple Locations, Paul, ID

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.