Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 13, 2026 at 8:00 PM
Updated May 16, 2026
Site work and new construction of an educational facility in Oakland, California. Completed plans call for the construction of a 41,000-square-foot educational facility; 29,775-square-foot educational facility; and for site work for a educational facility.
**This is Swinerton negotiated work and we are asking for budgetary pricing for the 100% DD milestone.** The project is for the phased construction of a new campus for the Garfield Elementary School in Oakland, California to replace the existing 2-story building that currently houses classrooms, administrative offices and multi-purpose room. Two new buildings will be situated on the east side of the site and will have a structurally-separate covered walkway between: Building A is ~41,000 sf at the south portion of the site. The two-story portion houses 6 early childhood education classrooms, 9 standard classrooms for grades 3-5, 2 sped classrooms, a multi-purpose room, kitchen and servery. The one-story portion houses administrative offices. Building B is ~29,775 sf at the north portion of the site. The two-story portion houses 4 early childhood education classrooms, 6 standard classrooms for grades 1-2, 2 sped classrooms, art classroom, music classroom, and the family resource center. The one-story portion houses the library. This new campus is designed to accommodate approximately 656 students from pre-k through grade 5, and about 84 teachers and staff. Buildings A & B will be steel-framed type II-B construction with automatic fire sprinkler protection. Classrooms will be 'E' occupancy, administrative offices and family resource center will be 'B' occupancy, and multi-purpose room and library will be 'A-3' occupancy. Upper floor classrooms will have spacious interior circulation with access to shared, flexible, learning and breakout spaces. Lower floor classrooms will have exterior circulation with direct access to playgrounds and courtyards. Site design will include: Street-facing entry plaza courtyard Interior courtyard with playgrounds and outdoor learning spaces Sports field, blacktop play areas, natural play areas Garden Staff parking area Other site work includes site utilities, grading, and landscaping. This project will be phased so the existing building and a western portion of the blacktop will remain in use by the school during construction of the new building. The existing site on the east will be demolished, then the new buildings, entry plaza courtyard, and an eastern portion of the interior courtyard will be constructed. The school will move into the new building, then the existing building will be demolished and the remaining west side of the site work (sports field, blacktop, play area, landscaping, staff parking area) will be completed Please feel to contact us if you any questions: Nate Hall - Nate.Hall@swinerton.com Alex Polcanov - APolcanov@swinerton.com Jeff Rosellini (For MEP trades) - JRosellini@swinerton.com OUSD's Local Business Utilization Policy 7115 apply to this project, and requires a mandatory fifty percent (50%) LBU participation with a 25% or less Local Business (LBE) participation and a 25% or more Small Local or Small Local Resident Business (SLBE/SLRBE) participation
Post-Bid
Educational
$36,000,000.00
Public - City
New Construction, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 15, 2026
July 6, 2027
1640 22nd Ave, Oakland, CA
Related To This Project
Oakland, CA
Bid Date: Jun 04 2026
Oakland, CA
Bid Date: Apr 29 2026
Oakland, CA
Bid Date: May 22 2026
Oakland, CA
Bid Date: May 20 2026
Oakland, CA
Bid Date: May 21 2026
Oakland, CA
Bid Date: May 12 2026
Oakland, CA
Bid Date: May 12 2026
Oakland, CA
Bid Date: May 11 2026
Oakland, CA
Bid Date: May 12 2026
Oakland, CA
Bid Date: May 08 2026
Oakland, CA
Bid Date: Jun 04 2026
Oakland, CA
Bid Date: May 07 2026
Oakland, CA
Bid Date: May 21 2026
Oakland, CA
Bid Date: May 07 2026
Oakland, CA
Bid Date: May 11 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
