Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 18, 2026 at 8:00 PM
Updated June 11, 2026
Site work for a water / sewer project in Millers Creek, North Carolina. Completed plans call for site work for a water / sewer project.
Wilkes Soil & Water Conservation District is requesting qualifications from Design-Build Firms to provide and assist with Engineering, Consulting, Design, and Construction/Contractor Services for Emergency Watershed Protection (EWP) projects as approved by the United States Department of Agriculture (USDA), Natural Resources Conservation Service (NRCS), and the Wilkes Soil & Water Conservation District Board. Work will be performed at two specific locations in Wilkes County, NC: 1. Site 4501-001: 300 LinFt x 17 Ft height Streambank and Shoreline Protection on Mulberry Creek. Approximately 1 acre of Critical Area Planting. 2. Site 4502-002: 85 LinFt x 40 Ft height Streambank and Shoreline Protection on the Yadkin River. Approximately 1.1 acre of Critical Area Planting. The selected Contractor shall provide all labor, materials, equipment, and professional engineering services to design and implement recovery measures in accordance with NRCS Conservation Practice Standard (CPS) 580 and 342. Phase I: Engineering & Design Survey & Analysis: Complete all engineering surveys and site analyses. Design Development: Prepare design, construction drawings, and specifications. All designs must meet NRCS standards and be approved by an NRCS engineer. Regulatory Support: Provide technical documentation and obtain all necessary Federal, State, and local permits. Quality Assurance Planning: Develop a project-specific Quality Assurance Plan (QAP) for NRCS approval. Operations & Maintenance: Develop an O&M Plan for the completed project. Phase II: Construction Implementation: Execute construction based on the NRCS-approved 100% design. Safety: Ensure compliance with OSHA regulations and the Contract Work Hours and Safety Standards Act. Cultural Resource Protection: Adhere to "stop-work" protocols if cultural resources (e.g., prehistoric artifacts, structural rock features) are discovered. Phase III: Check-Out As-Builts: Provide Certified As-Builts for project
Post-Bid
Water / Sewer
$1,500,000.00
Public - County
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 5, 2026
October 5, 2026
Multiple Locations, Millers Creek, NC
Related To This Project
Millers Creek, NC
Bid Date: Mar 31 2026
Millers Creek, NC
Bid Date: Mar 31 2026
Millers Creek, NC
Bid Date: Dec 08 2025
Millers Creek, NC
Bid Date: Oct 16 2025
Millers Creek, NC
Bid Date: Oct 16 2025
Millers Creek, NC
Bid Date: Dec 01 2020
Millers Creek, NC
Bid Date: Dec 09 2021
Millers Creek, NC
Bid Date: Aug 06 2025
Millers Creek, NC
Bid Date: Aug 06 2025
Millers Creek, NC
Bid Date: Jul 02 2025
Millers Creek, NC
Bid Date: Apr 17 2025
Millers Creek, NC
Bid Date: Apr 17 2025
Millers Creek, NC
Bid Date: Feb 18 2025
Millers Creek, NC
Bid Date: Apr 18 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
