BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 15, 2026 at 8:00 PM

Updated May 16, 2026

Renovation of a municipal facility in Millers Creek, North Carolina. Completed plans call for the renovation of a municipal facility.

Wilkes Soil & Water Conservation District is requesting qualifications from Design-Build Firms to provide and assist with Engineering, Consulting, Design, and Construction/Contractor Services for Emergency Watershed Protection (EWP) projects as approved by the United States Department of Agriculture (USDA), Natural Resources Conservation Service (NRCS), and the Wilkes Soil & Water Conservation District Board. Work will be performed at two specific locations in Wilkes County, NC: 1. Site 4501-001: 300 LinFt x 17 Ft height Streambank and Shoreline Protection on Mulberry Creek. Approximately 1 acre of Critical Area Planting. 2. Site 4502-002: 85 LinFt x 40 Ft height Streambank and Shoreline Protection on the Yadkin River. Approximately 1.1 acre of Critical Area Planting. The selected Contractor shall provide all labor, materials, equipment, and professional engineering services to design and implement recovery measures in accordance with NRCS Conservation Practice Standard (CPS) 580 and 342. Phase I: Engineering & Design Survey & Analysis: Complete all engineering surveys and site analyses. Design Development: Prepare design, construction drawings, and specifications. All designs must meet NRCS standards and be approved by an NRCS engineer. Regulatory Support: Provide technical documentation and obtain all necessary Federal, State, and local permits. Quality Assurance Planning: Develop a project-specific Quality Assurance Plan (QAP) for NRCS approval. Operations & Maintenance: Develop an O&M Plan for the completed project. Phase II: Construction Implementation: Execute construction based on the NRCS-approved 100% design. Safety: Ensure compliance with OSHA regulations and the Contract Work Hours and Safety Standards Act. Cultural Resource Protection: Adhere to "stop-work" protocols if cultural resources (e.g., prehistoric artifacts, structural rock features) are discovered. Phase III: Check-Out As-Builts: Provide Certified As-Builts for project

GC Bidding

Municipal

$1,500,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
229
Active Projects
106
Bidding Soon
1,360
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 5, 2026

October 5, 2026

Project location map

Multiple Locations, Millers Creek, NC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.