BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 3, 2026 at 8:00 PM

Updated June 4, 2026

Demolition and renovation of an educational facility in Omaha, Nebraska. Completed plans call for the renovation of a educational facility; and for the demolition of a educational facility.

Furnish all labor, materials, tools, equipment, utility and transportation services for the replacement of the boiler at Gomez Elementary School. The work includes demolition of one existing boiler and piping, and the expansion tank and piping. Installation of two new high efficiency hot water boilers in an adjacent room being converted to a mechanical room. Installation of new heat exchangers to provide backup heat to an existing ground source heat pump loop. Work also includes all required piping, controls, ducting and general work required so that all equipment being installed functions as designed.

GC Bidding

Educational

$1,500,000.00

Public - City

Demolition, Renovation

12

15

22

6

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
124
Active Projects
74
Bidding Soon
999
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 12, 2026

July 27, 2026

Project location map

5101 S 17th St, Omaha, NE

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.