BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 30, 2026 at 8:00 PM

Updated May 31, 2026

Renovation of a multi-residential development in Baltimore, Maryland. Completed plans call for the renovation of a two-unit multi-residential development.

The Contractor shall supply all labor, material, supervision, equipment, insurance, permits including U&O (Unit of Occupancy Permit) and all other incidentals required to complete the work items listed as requested by HABC, in accordance with all applicable federal, state and local regulations. Project locations 251 Silver Ct. 210 N. Douglass Ct. General: :( ALL SUPPLIES ARE TO BE SUPPLIED BY CONTRACTOR UNLESS STATED OTHERWISE) 1. Remove and properly dispose of all trash - hazardous material, furniture and miscellaneous items in the unit. 2. Contractor is to supply dumpster or dump truck to remove bulk trash and dispose of properly 3. Supply and install all new window blinds (2 inch faux wood blinds) 4. Remove all existing appliances and range hood 5. Abate any mold observed throughout unit 6. Supply and install closet shelving/rod 7. Supply and install wood handrail with brackets 8. Clean behind all Radiators 9. Final cleaning of entire unit to make ready for occupancy including cleaning behind radiators and waxing floors upon exiting unit for turnover to maintenance dept. 10. Ensure unit is ready for Lead inspection upon completion o If any conditions outlined in the invitation for bid are not met the unit will not be accepted by site staff Kitchen: ( ALL SUPPLIES ARE TO BE SUPPLIED BY CONTRACTOR UNLESS STATED OTHERWISE) 1. Supply and install Broan #4100 range hood (Black) 2. Close off existing wall fan and wire new range hood where applicable. 3. Install Range hood light bulb 4. Supply & install severe use wood base and wall cabinets "Magnolia Cabinetry Harvard in 'Honey'" ( Or similar color) 5. Insure toe kick is installed under cabinets 6. Install Postformed Wilsonart Black Granite Laminate countertops 7. Supply and install heat shield/backsplash for stove 8. Appliances are to be provided by Housing and installed by contractors. 9. Contractor will supply and install new gas supply lines on all gas appliances 10. Contractor will replace any broken gas shut off valves Bathrooms: ( ALL SUPPLIES ARE TO BE SUPPLIED BY CONTRACTOR UNLESS STATED OTHERWISE) 1. Supply and install Vanity Cabinet w/ vanity bowl and faucet (18 inch - 2-piece combo white) 2. Replace Tub 3. Supply and install ceramic tile tub wall to ceiling (Tile 12x24 color- white and grey or black marble) 4. Wrap window well and sill with same tile as wall 5. Supply and install One (1) new elongated toilet /w toilet seat (Seasons Raleigh All In One)6. Supply and install New Medicine Cabinet with Mirror 7. Supply and install all new bathroom accessories, (towel bar,soap dish, toothbrush holdershower pole-attached) non-UFAS Mechanical / Plumbing: : ( ALL SUPPLIES ARE TO BE SUPPLIED BY CONTRACTOR UNLESS STATED OTHERWISE 1. Check and Inspect Gas Distribution (Stove) for service and repair any leaks. 2. Check and inspect Water Distribution (Bathroom & Kitchen) for leaks, repair leaks throughout whole unit 3. Inspect and Repair (if necessary) Drain, Water & Vent (Bathroom and Kitchen, toilets) 4. Replace washing machine outlet box and valves 5. Replace all water shut off valves 6. Install New shower diverter ( Delta R10000-UNWS) and trim package (Delta rp19809) 7. Ensure all pest entry points are sealed ( walls and around plumbing, behind radiators, under cabinets etc..) Electrical: ( ALL SUPPLIES ARE TO BE SUPPLIED BY CONTRACTOR UNLESS STATED OTHERWISE) 1. Replace all light fixtures with LED integrated light fixtures 13 inch kitchen - 11 inch hallways. 2. Supply and install 10yr sealed smoke detector in each bedroom. CO/Smoke Combo in hallway and kitchen area 3. Replace all switches and receptacles / w plates throughout unit (White) 4. Inspect electrical panel for gaps or missing breakers Replace or Repair 6. Remove all electrical raceways and install conduit and surface mount boxes for outlets ( 20 Amp ) 7. Install conduit and outlets to power stove and range hood Doors & Windows: ( ALL SUPPLIES ARE TO BE SUPPLIED BY CONTRACTOR UNLESS STATED OTHERWISE) 1. Supply and install solid core two panel arch top door(s) with knob hardware on existing frames 2. Repair or replace windows in unit ( Broken panes, locks, and balances) - If window cannot be repaired the contractor is to supply and install a completely new window *( Check all windows during site visit for repairability.) 3. It is the responsibility of the contractor to check all window conditions prior to submitting bid during site visit

Bid Results

Multi-Residential

$34,200.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
673
Active Projects
311
Bidding Soon
4,267
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 28, 2026

June 29, 2026

Project location map

Multiple Locations, Baltimore, MD

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.