BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 14, 2026 at 8:00 PM

Updated May 15, 2026

Site work and paving for a transportation facility in Faulkton, South Dakota. Completed plans call for site work for a transportation facility.

Sealed bids will be received for furnishing all equipment, labor, and materials as set forth in the specifications and performing all work, incidental thereto for Runway 13/31 Reconstruction & Taxiway Improvements at Faulkton Municipal Airport, Faulkton, South Dakota. The primary work includes approximately 262 SqYd Asphalt Cold Milling (2” Nominal Depth), 24,502 SqYd Asphalt Pavement/Base Removal (8” Nominal Depth), 86,025 CuYd Unclassified Excavation, 17,308 CuYd Borrow Excavation (On-site), 30,780 CuYd Subbase Course (Furnished), 4,764 CuYd Subbase Course (Recycled), 44,655 SqYd Geotextile Separator Fabric, 1,500 SqYd Geogrid, 7,089 CuYd Aggregate Base Course, 9,718.8 Ton Asphalt Base/Surface Course, 680.3 Ton Asphalt Binder (PG 64-34), 54.9 Emulsified Asphalt Prime Coat, 18.3 Emulsified Asphalt Tack Coat, Temporary Runway and Taxiway Pavement Markings, Runway and Taxiway Pavement Markings, 248 Ft 30” RCP (Class III), 2 Each 30” RCP (Class III) Flared Ends, 302 Ft 24” RCP (Class III), 4 Each 24” RCP (Class III) Flared Ends, 226 Ft 15” RCP (Class III), 3 Each 15” RCP (Class III) Flared Ends, 9,532 Ft 4” Perforated Underdrain Pipe Complete, 26 Each Underdrain Cleanout, 2 Each Underdrain Tee, 10 Each Connect Underdrain to RCP Storm Sewer, 1 Each Connect to Existing Underdrain, 1 Each Cap and Abandon Existing Underdrain, 1 Each 2’x3’ Type B Inlet w/Type E Frame, Grate, and 10’x10’ Concrete Apron, 9,791 Ft Barbed Wire Fence, 3 Each Tubular Gate, 1,278 Ft 10’ Chain-Link Fence, 16.9 Acres Seeding and Fertilizing, 13,564 CuYd Topsoil (Removed from Stockpile), 81,709 SqYd Mulching, Field Laboratory, Existing Site Removals, Erosion Control, 1 Each Remove and Dispose of Existing Primary Windcone; Remove and Dispose of Concrete Footing, 1 Each L807, LED, Style 1B (Internally Lit), Size 2 (12 Feet) w/ Single L-810 LED Steady Burn Red Obstruction Light Including Concrete Footing & Site Pad, 1 Each Electrical Equipment Rack, Locating Existing Underground Utility Work, 10,000 Ft 1/C No. 8 AWG, 5kV, XLPE, L-824, Type C Cable Installed in Conduit, 3,672 Ft 1/C No. 4 Cu. AWG, 600V, THWN-2.

GC Bidding

Transportation Terminals

$4,000,000.00

Public - City

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
13
Active Projects
8
Bidding Soon
137
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 2, 2026

July 17, 2026

Project location map

To be determined, Faulkton, SD

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.