Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 17, 2026 at 8:00 PM
Updated May 19, 2026
Site work and new construction of a water / sewer project in Del Rio, Texas. Completed plans call civil work for a water / sewer project.
Construction of approximately 1,940 LF of 33-inch and approximately 4,660 LF of 30-inch wastewater gravity mains by open cut and approximately thirty-one (31) manholes. The alignment includes a Union Pacific Railroad crossing which will require approximately 102 LF of 48-inch steel encasement by trenchless methods. The alignment begins at the Silver Lake WWTP and ends at Owens Dr. The project will include all pipes, manholes, encasements, lateral connections, surface restoration including pavement, testing, SWPPP measures, traffic control, and related material & procedures as outlined in the construction plans and specifications. Construction of sanitary sewer collection system pipeline & components replacing existing sanitary sewer infrastructure including approximately 37,600 LF total (6,600 LF for Phase I) of wastewater gravity mains and associated sitework as shown in the drawings. The project will include all pipes, manholes, encasements, lateral connections, surface restoration including pavement, testing, SWPPP measures, traffic control, and related material & procedures as outlined in the construction plans and specifications. The Del Rio Northside Sewer Line Project begins at the Silver Lake WWTP. The sewer main travels northwest onto Cienegas Rd. and extends toward the City of Del Rio International Airport. After the airport, the alignment runs parallel along Nicholas St., where it reaches West Cantu Rd. and continues onto Encino Dr., where it turns northeast and crosses Kings Way. The sewer main travels parallel on Fox Dr., follows the drainage channel heading north (parallel to US-90), and terminates at the Edwards Lift Station. Phase I begins at the Silver Lake WWTP and ends at Owens Dr.
GC Bidding
Water / Sewer
$6,900,000.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 26, 2026
August 10, 2026
Multiple Locations, Del Rio, TX
Related To This Project
Del Rio, TX
Bid Date: May 27 2026
Del Rio, TX
Bid Date: May 07 2026
Del Rio, TX
Bid Date: May 19 2026
Del Rio, TX
Bid Date: May 14 2026
Del Rio, TX
Bid Date: Mar 19 2026
Del Rio, TX
Bid Date: Mar 19 2026
Del Rio, TX
--
Del Rio, TX
Bid Date: Mar 18 2026
Del Rio, TX
Bid Date: Jan 13 2026
Del Rio, TX
Bid Date: Feb 19 2026
Del Rio, TX
--
Del Rio, TX
Bid Date: Dec 19 2025
Del Rio, TX
Bid Date: Dec 02 2025
Del Rio, TX
Bid Date: Dec 02 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
