BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 17, 2026 at 8:00 PM

Updated May 19, 2026

Site work and new construction of a water / sewer project in Del Rio, Texas. Completed plans call civil work for a water / sewer project.

Construction of approximately 1,940 LF of 33-inch and approximately 4,660 LF of 30-inch wastewater gravity mains by open cut and approximately thirty-one (31) manholes. The alignment includes a Union Pacific Railroad crossing which will require approximately 102 LF of 48-inch steel encasement by trenchless methods. The alignment begins at the Silver Lake WWTP and ends at Owens Dr. The project will include all pipes, manholes, encasements, lateral connections, surface restoration including pavement, testing, SWPPP measures, traffic control, and related material & procedures as outlined in the construction plans and specifications. Construction of sanitary sewer collection system pipeline & components replacing existing sanitary sewer infrastructure including approximately 37,600 LF total (6,600 LF for Phase I) of wastewater gravity mains and associated sitework as shown in the drawings. The project will include all pipes, manholes, encasements, lateral connections, surface restoration including pavement, testing, SWPPP measures, traffic control, and related material & procedures as outlined in the construction plans and specifications. The Del Rio Northside Sewer Line Project begins at the Silver Lake WWTP. The sewer main travels northwest onto Cienegas Rd. and extends toward the City of Del Rio International Airport. After the airport, the alignment runs parallel along Nicholas St., where it reaches West Cantu Rd. and continues onto Encino Dr., where it turns northeast and crosses Kings Way. The sewer main travels parallel on Fox Dr., follows the drainage channel heading north (parallel to US-90), and terminates at the Edwards Lift Station. Phase I begins at the Silver Lake WWTP and ends at Owens Dr.

GC Bidding

Water / Sewer

$6,900,000.00

Public - City

New Construction, Site Work

74

29

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
12
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 26, 2026

August 10, 2026

Project location map

Multiple Locations, Del Rio, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.