BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 14, 2026 at 8:00 PM

Updated May 16, 2026

Renovation of an educational facility in Forest, Mississippi. Completed plans call for the renovation of a educational facility.

The project includes cafeteria renovations at Forest High School, consisting of a new ceiling system, lighting, rubber base, wall finishes, serving line, and drinking fountain as shown in the contract documents. Additive alternates include new serving lines for Hawkins Middle School and Forest Elementary School; interior kitchen upgrades at Forest High School; installation of porcelain floor tile in the Forest High School cafeteria dining area; new cafeteria seating; rollup doors at Forest High School; and a new washer and dryer area for the Forest Elementary School cafeteria. Sealed lump sum bids will be received for all work required by the contract documents in accordance with the Instructions to Bidders. Proposals must be delivered in a sealed envelope marked plainly as specified, listing the bidder's company name, address, and all applicable state and local license and registration numbers. Electronic bids may also be submitted through the designated website. Proposals must be submitted in duplicate only upon the blank proposal forms provided and must be accompanied by Proposal Security in the form of a Certified Check or acceptable Bid Bond in an amount equal to at least five percent of the Base Bid. No bids may be withdrawn for a period of 90 days after opening. The Owner reserves the right to reject any and all bids and to waive informalities and irregularities. Bidders must be properly licensed and able to obtain insurance and bonds required for the work. A Performance Bond, separate Labor and Material Payment Bond, and Insurance in a form acceptable to Owner will be required of the successful bidder. The work associated with the Forest High School kitchen and serving line, as well as serving lines at Hawkins Middle School and Forest Elementary School, shall be substantially completed by July 30, 2026, and the entire project shall be fully completed no later than September 1, 2026. The work is subject to liquidated damages as set forth in the Contract Documents.

GC Bidding

Educational

$1,000,000.00

Public - City

Renovation

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 11, 2026

July 26, 2026

Project location map

To be determined, Forest, MS

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.