BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 13, 2026 at 8:00 PM

Updated July 19, 2026

Site work, paving and new construction of a civil project in Naperville, Illinois. Completed plans call for the construction of a water / sewer project; and water / sewer project.

https://www.enr.com/articles/63157-400m-30-mile-illinois-water-pipeline-moves-forward Construction is underway on a $400-million, 30-mile-long pipeline planned to bring Lake Michigan water to the communities of Montgomery, Oswego and Yorkville, Ill., in far west suburban Chicago. The WaterLink project, which broke ground officially on June 10, is expected to supply drinking water for approximately 90,000 residents, extend the Lake Michigan water service region, and replace reliance on a depleting aquifer. Burns & McDonnell is providing program management and construction observation on behalf of the pipeline owner-operator, the DuPage Water Commission, supporting 12 contract packages across several counties and jurisdictions. The project is using a design-bid-build delivery method across the packages, resulting in smaller segments being individually competitively bid and built by general contractors. The project is the result of nearly a decade of study of future water needs during which the communities determined that their current water source, the Ironton-Galesville deep sandstone aquifer, will be unable to meet projected demand as early as 2050. “WaterLink includes up to 54-in. transmission mains routed through established communities, ComEd rights-of-way and major highway, railroad, utility, and river crossings. Eleven of the 30 miles of transmission main are routed in ComEd utility easements, reducing project costs, timeline and construction impact on the communities,” says Paul May, general manager of the water commission, in an email. “WaterLink brings together the technical complexity and community purpose that define critical infrastructure,” adds Joe Darlington, WaterLink program manager at Burns & McDonnell, noting that the project will require coordination with many stakeholders. In 2021, following technical, financial and environmental analysis, the municipalities formally partnered to pursue a new water source and identified Lake Michigan water delivered through the water commission as the new source. Burns & McDonnell says the project includes multiple municipal delivery points and requires complex infrastructure work spanning residential neighborhoods, roadways and utility easements. Construction began in December 2025 and will continue through 2028, paid for by a combination of federal loans and local funding. The main starts in the western suburb of Naperville, Ill. and runs west crossing major highways and the Fox River before reaching the destination communities. The project is expected to continue through 2028. Other contractors involved in the project include: Arcadis, Bowman Consulting Group, Christopher B. Burke Engineering, LAN (Lockwood, Andrews & Newman), Robinson Engineering, Stanley Consultants, Benchmark Construction Co., Airy's Inc. and Water Well Solutions Illinois Division. -------------------------- Construction of MS 22/25 - Seven (7) meter stations and one (1) chemical feed building located in City of Naperville, United City of Yorkville, Village of Montgomery, Village of Oswego, Oswego Township, Bristol Township, Kendall Township, Wheatland Township, Kendall County, and Will County. Work generally includes, but is not limited to, 16-, 20, and 24-inch diameter water main construction (open-cut), connections to adjacent contracts, meter station building construction (structural, architectural, piping, electrical, and controls), removal, relocation, and replacement of existing underground utilities, roadway reconstruction and paving, traffic control, landscape restoration, storm water pollution control and erosion control, and testing.

Award

Water / Sewer

$13,396,000.00

Public - County

New Construction, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
616
Active Projects
8
Bidding Soon
4,366
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 5, 2026

July 20, 2026

Project location map

Multiple locations, Naperville, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.