BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 15, 2026 at 8:00 PM

Updated May 16, 2026

Site work, paving, new construction and renovation of a mixed-use development in Dripping Springs, Texas. Completed plans call for the construction of a bridge / tunnel.

The project generally includes 220 linear feet of crushed limestone equestrian trail restoration and ditch grading with a concrete sidewalk culvert. Additive alternates include 165 linear feet of a 6-foot wide concrete sidewalk trail with a 20-foot span steel pedestrian bridge, an asphalt pavement dumpster landing area with a compacted flexible base, miscellaneous sidewalk extensions, and revegetation. Bonds: 5% Bid Bond, 100% Performance Bond, 100% Payment Bond.

GC Bidding

Playgrounds / Parks / Athletic Fields

$500,000.00

Public - City

New Construction, Paving, Renovation, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
291
Active Projects
110
Bidding Soon
2,170
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 4, 2026

July 19, 2026

Project location map

1042 Event Center Drive, Dripping Springs, TX


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.