Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 15, 2026 at 8:00 PM
Updated May 16, 2026
Site work for a mixed-use development in Graham, North Carolina. Conceptual plans call for site work for a data center facility; and educational facility.
The project consists of two integrated work elements: (1) Design of a diverse underground conduit pathway system providing a minimum of two separate and independent connectivity paths to each building on the Carrington-Scott Campus at 1247 Jimmie Kerr Road, Graham, NC, linking all campus buildings to a central distribution point(s). Work includes, but is not limited to, directional boring, trenching, conduit installation, pull boxes, handholes, and restoration of all disturbed surfaces. (2) Design of a redundant 24-strand single-mode fiber optic (SMF) network operating over the newly installed conduit system, with all strands terminated, tested and connected to both of the College's on-campus data centers (Located in T Bldg and Main Bldg). The network architecture shall provide fully redundant pathways to eliminate single points of failure. Submit three (3) copies of qualifications information package and SF-254. See project brief for additional proposal submittal requirements.
Conceptual
Data Centers
$700,000.00
Public - State/Provincial
Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 2, 2026
July 17, 2026
1247 Jimmie Kerr Road, Graham, NC
Related To This Project
Graham, NC
Bid Date: May 05 2026
Graham, NC
Bid Date: Jun 02 2026
Graham, NC
--
Graham, NC
Bid Date: Apr 24 2026
Graham, NC
Bid Date: May 13 2026
Graham, NC
Bid Date: Mar 17 2026
Graham, NC
Bid Date: Feb 17 2026
Graham, NC
Bid Date: Jan 30 2026
Graham, NC
Bid Date: Oct 01 2021
Graham, NC
Bid Date: Jan 15 2026
Graham, NC
Bid Date: Jan 09 2026
Graham, NC
Bid Date: Nov 25 2025
Graham, NC
Bid Date: Oct 28 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
