BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 15, 2026 at 8:00 PM

Updated May 16, 2026

Site work for a mixed-use development in Graham, North Carolina. Conceptual plans call for site work for a data center facility; and educational facility.

The project consists of two integrated work elements: (1) Design of a diverse underground conduit pathway system providing a minimum of two separate and independent connectivity paths to each building on the Carrington-Scott Campus at 1247 Jimmie Kerr Road, Graham, NC, linking all campus buildings to a central distribution point(s). Work includes, but is not limited to, directional boring, trenching, conduit installation, pull boxes, handholes, and restoration of all disturbed surfaces. (2) Design of a redundant 24-strand single-mode fiber optic (SMF) network operating over the newly installed conduit system, with all strands terminated, tested and connected to both of the College's on-campus data centers (Located in T Bldg and Main Bldg). The network architecture shall provide fully redundant pathways to eliminate single points of failure. Submit three (3) copies of qualifications information package and SF-254. See project brief for additional proposal submittal requirements.

Conceptual

Data Centers

$700,000.00

Public - State/Provincial

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
256
Active Projects
127
Bidding Soon
1,858
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 2, 2026

July 17, 2026

Project location map

1247 Jimmie Kerr Road, Graham, NC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.