BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 15, 2026 at 8:00 PM

Updated May 16, 2026

Demolition, site work, paving and new construction of a mixed-use development in Fort Worth, Texas. Completed plans call for the construction of a water / sewer project; and bridge / tunnel.

The work consists of the construction of an approximately 3,900 feet long and 300 feet wide bypass channel consisting of a floodwall on the east side (right bank) and an earthen levee on the west side (left bank). The project includes a combination of flood risk management, betterment features, pedestrian walkways and bridges, lighting, plaza parks, kayak launches, accessibility with signage, stop logs, storage areas, and stormwater infrastructure. Set-asides: 24% SBE, 9% DBE, 3% WBE, 1% HUB, 2% SBE, 2% DVBE.

Sub-Bidding

Water / Sewer

$250,000,000.00

Public - Federal

Demolition, New Construction, Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
369
Active Projects
135
Bidding Soon
3,075
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 26, 2026

July 10, 2026

Project location map

To be Determined, Fort Worth, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.