BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 15, 2026 at 8:00 PM

Updated May 16, 2026

Site work, new construction and renovation of an educational facility in Pittsburg, California. Completed plans call for the construction of a one-story above grade educational facility; for the renovation of a educational facility; and for site work for a educational facility.

The Project includes the purchase and installation of a turn-key Single-Story Modular Classrooms Building, made up of two separate buildings connected by a breezeway roof. The building will include eight regular Classrooms, two TK/K Classrooms with a Single-Use Student Restroom in each, one Boys Student Restroom, one Girls Student Restroom, one Single-Use Staff Restroom, one Single-Use Student Restroom, one Utilities Room, and one Custodial Room. The building pad, storm drain lines, sanitary sewer lines, domestic water supply lines, and building adjacent site improvements will be in place as constructed by the Increment 1 Contractor. The buildings' interior finishes, built-in casework, exterior finishes, fenestrations, door hardware, plumbing fixtures, and low voltage systems shall meet District Standards and all current CA Energy Code requirements. The Project also includes the replacement of the School's Existing PA and Clock & Bell System.

GC Bidding

Educational

$3,000,000.00

Public - City

New Construction, Renovation, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
482
Active Projects
211
Bidding Soon
2,532
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 4, 2026

October 5, 2026

Project location map

4141 Harbor Street, Pittsburg, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.