Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 21, 2026 at 8:00 PM

Updated September 27, 2026

Demolition, site work, paving and new construction of a mixed-use development in Inverness, Florida. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; for the construction of a bridge / tunnel; road / highway; for the demolition of a bridge / tunnel; sidewalk / parking lot; and sidewalk / parking lot.

District : 07 This is an FC-5 Replacement Milling and Resurfacing Pavement Only Low Bid Design-Build project in Citrus County. The intent of this Low Bid Design-Build project is to replace existing raveling FC-5 Friction Course with new FC-12.5 Friction Course in separate segmented areas from west of Homosassa Trail (MP 6.762) to west of N Central Ave (MP 15.200) for a total project construction length of 1.378 miles. The scope of work requires the replacement of the FC-5 Friction Course and pavement markings that will be impacted by the milling and resurfacing. Other improvements, including cross slope correction, RRR improvements, and ADA improvements, are not included in the scope of work. Required limits and depth of milling and resurfacing is detailed in Attachments A04.01, A05.01 and A06.01. Tech Proposal Due Date/Time 7/23/2026 07:30 pm Bid Price Due Date/Time 7/23/2026 07:30 pm Bid Opening Date/Time 7/23/2026 07:30 pm Technical Review Committee Meeting 1 Date/Time 7/27/2026 07:30 pm Final Selection Date/Time 8/03/2026 07:00 pm The method of contractor selection has not been determined at this time. FL DOT - RFP D/B - SR44 From MP 4.71 to 15.20 Question Deadline 07/10/2026 Award is subject to final approval.

Award

Roads / Highways

$1,320,453.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
421
Active Projects
170
Bidding Soon
2,517
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 21, 2026

March 22, 2027

Project location map

FL-44, Inverness, FL


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed