Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 15, 2026 at 8:00 PM
Updated May 15, 2026
Site work and paving for a mixed-use development in Waterloo, Ontario. Completed plans call for site work for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and sidewalk / parking lot.
University Avenue West MUP (Multi-Use Path): This section of the project will consist of a multi-use path construction of the south side of the road. It will include the removal of existing sidewalk, asphalt, concrete, curb and gutter and vegetation along the proposed path. It will also include ditch grading, replacement of asphalt, curb and gutter, truncated domes with new pavement markings. Courtland Avenue East Infill Sidewalk: This section of the project will include clearing and grubbing of existing vegetation for the installation of a new sidewalk and restoration of boulevard. Maple Grove MUP (Multi-Use Path): This section of the project will include the removal of existing sidewalk and replacement of existing bus shelter to enable installation of a MUP with colored impressed concrete boulevard. It will also include restoration of boulevard with hydroseed. Fountain Street MUP (Multi-Use Path): This section of the project will include the removal and replacement of asphalt, concrete, curb and gutter for the installation of new bus pads and MUP with pavement markings. Benton Street/Frederick Street Resurfacing, Watermain Replacement and Storm Sewer Repair: This section of the project will include the removal of existing pavement for installation of new pavement to match existing condition. It will include the removal of asphalt and excavation for replacement of existing 150mm diameter ductile iron watermain to 300mm diameter PVC watermain in the same location/elevation. There will be a temporary water service connection installed above-ground to facilitate this upgrade. Additionally, this section will include the removal of storm sewers at 3 locations for replacement. 2420 Townline Road Right-of-Way Median Works: This section of the project will include the replacement of existing asphalt and curb for the installation of a new traffic median. Suppliers are not required to register for a bid opportunity prior to previewing unsecured bid documents. To download secured documents and/or to participate in this opportunity, you will need to have a subscription plan or buy Pay-Per-Bid access for this opportunity.
GC Bidding
Roads / Highways
$3,000,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 9, 2026
July 24, 2026
To be determined, Waterloo, ON
Related To This Project
Waterloo, ON
Bid Date: Jun 16 2026
Waterloo, ON
Bid Date: May 05 2026
Waterloo, ON
Bid Date: May 04 2026
Waterloo, ON
Bid Date: May 26 2026
Waterloo, ON
Bid Date: Jun 02 2026
Waterloo, ON
Bid Date: May 08 2026
Waterloo, ON
Bid Date: May 11 2026
Waterloo, ON
Bid Date: Jun 01 2026
Waterloo, ON
Bid Date: Jun 02 2026
Waterloo, ON
Bid Date: May 26 2026
Waterloo, ON
--
Waterloo, ON
Bid Date: Jun 05 2026
Waterloo, ON
Bid Date: May 13 2026
Waterloo, ON
Bid Date: Jun 03 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
