BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 23, 2026 at 8:00 PM

Updated May 24, 2026

Site work for a water / sewer project in West Wendover, Nevada. Completed plans call for site work for a water / sewer project.

The Work includes installation of HDPE liner inside a concrete tank, as well as cleaning, disinfection, and testing to meet Nevada safe drinking water standards. Bidders are highly suggested to visit the tank site to better understand the conditions that will be encountered for this project. Est. Completion Date: July 16, 2026 The Project includes the following Work: Installation of HDPE liner inside concrete tank. Cleaning, disinfection and testing to meet Nevada safe drinking water standards.

GC Bidding

Water / Sewer

$100,000.00

Public - City

Site Work

18

9

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
2
Active Projects
2
Bidding Soon
12
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 4, 2026

July 3, 2026

Project location map

3280 Wendover Blvd, West Wendover, NV

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.