BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 27, 2026 at 8:00 PM

Updated June 11, 2026

Site work and new construction of a development in San Carlos, California. Completed plans call for the construction of a development; and for site work for a development.

This project is for the construction of the Shoreway Environmental Center Monument Signage. Project Description: Demolition of two (2) existing monument signs, plus concrete base. Existing sign (1) is approximately 10' - 4" wide and 8' - 0" tall. Existing sign (2) is approximately 7' - 4" wide and 8' - 0" tall. Existing signs have a concrete base of approximately 8" - 12" tall. Fabrication and construction of two (2) new monument signs, plus concrete base and footing. New sign (1) is approximately 10' - 4" wide and 15' - 0" tall. New sign (2) is approximately 7' - 4" wide and 11' - 6" tall. Concrete base and footing engineering to be provided in the scope of work. Work shall be completed within 60 Days from the date when Contract Time commences to run. Optional Pre-Bid Site Visit: Owner will conduct an Optional Pre-Bid Site Visit at 1PM on Tuesday, May 26, 2026 at Shoreway Environmental Center 333 Shoreway Way San Carlos, CA 94070. Question Deadline 05/29/2026 Bidders must direct all questions about the meaning or intent of Bidding Documents to Owner in writing. Interpretations or clarifications considered necessary by Owner in response to such questions will be issued by written Addenda via email delivery to all parties recorded by Owner as having received Bidding Documents. Owner may not answer questions received less than 10 Days prior to the date for opening Bids.

Post-Bid

Conservation and Development

$3,000,000.00

Public - City

New Construction, Site Work

9

5

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
415
Active Projects
194
Bidding Soon
3,258
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 10, 2026

August 10, 2026

Project location map

333 Shoreway Rd, San Carlos, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.