Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 28, 2026 at 8:00 PM

Updated June 11, 2026

Site work for a bridge / tunnel in Blackville, New Brunswick. Completed plans call for site work for a bridge / tunnel.

Reference Number NB-BW6P23 Replacement of existing 600 mm by 900 mm timber box culvert with new 1800 mm diameter concrete culvert including earthworks excavation backfill water control riprap trail reconstruction aggregate base and environmental protection measures Documents can be found at https://secure.cinet.ca/project/info/9b09e2a0-5053-11f1-8802-5db1188090ab

Post-Bid

Bridges / Tunnels

$400,000.00

Public - State/Provincial

Site Work

6

9

4

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
64
Active Projects
26
Bidding Soon
321
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 9, 2026

July 9, 2026

Project location map

NB Trail, Blackville, NB

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed