BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 18, 2026 at 8:00 PM

Updated May 19, 2026

Site work for a pipeline in Geneva, Alabama. Completed plans call for site work for a pipeline.

The work involves the installation of approximately 14,150 linear feet of 4-inch steel gas main, 600 linear feet of 2-inch steel gas main, and 1,900 linear feet of 2-inch HDPE gas main. It also includes the installation of 700 linear feet of 3/4-inch steel service line, approximately seven service connections, associated valves and taps, about 15 tie-ins to existing gas mains, and the abandonment of existing mains along SR 52 between Hartford and Slocumb. The project must be substantially completed within 120 calendar days and fully completed within 150 calendar days from the contract commencement. Bidders must be properly licensed under Alabama State Law Governing General Contractors, must carry the MU - Municipal and Utility classification, and provide evidence of licensing. Nonresident contractors must submit proper registration and a Certificate of Good Standing as a Foreign Corporation. Preference will be given to resident contractors as per Alabama law. All contractors and subcontractors must comply with E-Verify requirements and submit the Affidavit of Immigration Compliance and required documentation. The contractor will also be required to provide two Owner's Protective Liability Policies naming Geneva County Gas District and Three Notch Group, Inc. as insureds. The Owner reserves the right to accept or reject any or all bids.

Sub-Bidding

Pipeline

$5,000,000.00

Public - County

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
78
Active Projects
38
Bidding Soon
411
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 2, 2026

July 17, 2026

Project location map

To be determined, Geneva, AL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.