Published June 12, 2026 at 8:00 PM

Updated June 13, 2026

Site work, new construction and renovation of a water / sewer project in Aurora, Illinois. Completed plans call for the renovation of a water / sewer project; for site work for a water / sewer project; and for the construction of a water / sewer project.

The City of Aurora is seeking a qualified contractor to furnish all labor, materials, equipment, and supervision necessary to provide and install a new roofing membrane over the existing membrane roof at the River Intake Building, located at 1110 Aurora Avenue, Aurora, Illinois. Work shall include all necessary preparation of the existing roof surface, installation of the new membrane roofing system, flashing, sealing, and all incidental work required to provide a complete and watertight roofing system in accordance with the project specifications. Question Deadline 05/29/2026 at 11:00 AM CT Bidders shall submit all inquiries, including requests for alternates or substitutions regarding this bid, up to, but no later than the designated date and time as specified via the Citys E Procurement System, Roofing o The existing EPDM roofing system and insulation are to remain in place. o It is the City's intent to reuse all existing sheet metal coping caps. Therefore care should be taken when removing them during the project. Should replacement be warranted due to damage, replacement costs are addressed under OPTION 1. o Existing perimeter and penetration membrane flashings shall be removed prior to insulation and membrane installation. Dispose of said membrane flashings in approved licensed waste hauler. o Plan and coordinate any tear-off operation with the installation of the new roof system to ensure the roof system will be watertight at the end of each day. The existing roof deck and insulation will not be exposed to the weather at the end of each workday o Inspect all wood nailers and insulation stops for deterioration. Any deteriorated wood nailers and/or insulation stops will be replaced with new wood. Wood replacement will be performed on a unit price basis under OPTION 2. o The contractor shall install one (1) layer of 1" polyisocyanurate cover board. Cover board to be installed over the existing EPDM roofing assembly. The new cover board shall be mechanically fastened through the existing roofing system and into the underlying metal deck according to manufacturer's 20-year warranted roofing specifications. o At lower roof area at perimeter edge, new tapered insulation is to be installed to promote positive drainage back to roof drains. o Cover all the insulation laid each day with the roofing membrane.Furnish and install new EPDM "Single-Ply Roofing System." This membrane is a black, non-reinforced, 60-mil sheet, which will be adhered with solvent-based contact adhesive to new insulation cover board package as noted. The membrane will be secured around the perimeter and all penetrations according to 20-year warranty specifications. All field seams will be bonded using manufacturers pre-applied seam tape or with new 3" wide seam tape based on availability. o The EPDM membrane shall be a Class A rated component without rock ballast or topical coatings. It shall be approved by Underwriters Laboratory, Factory Mutual, and the major model building codes for fire and wind uplift resistance. o Install new EPDM 60-mil membrane base flashings at walls, curbs, and other penetrations in accordance with the membrane manufacturers requirements. o Install accessories items provided by major manufacture according to specifications and details. All manufactured accessories supplied by the manufacturer are included in the manufacturer's 20-year labor and material warranty. o At existing 8' x 10' metal covers, the contractor will remove the cover and install a looselaid 60-mil piece of rubber to protect existing wood substrate. The existing covers shall be reused. o A City Permit for Roofing will be needed. The application form is included.

Bid Results

Water / Sewer

$61,714.00

Public - City

New Construction, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
427
Active Projects
210
Bidding Soon
4,323
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 10, 2026

July 10, 2026

Project location map

1110 Aurora Ave, Aurora, IL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.