Published May 22, 2026 at 8:00 PM

Updated May 23, 2026

Site work for a water / sewer project in Okeechobee, Florida. Completed plans call for site work for a water / sewer project.

The work includes providing all materials, equipment, and labor for the construction of the Okeechobee Utility Authority VPS #5 Group J Septic to Sewer Project. The contractor shall install 4-inch diameter PVC sewer laterals, decommission onsite residential septic tanks, connect into the existing sewer lateral located at the right-of-way of each residence, and restore the work area. Bidders must submit bids for the entire project; partial bids will not be considered. Each bid must include evidence of licensure or qualification to perform the work. Bids must be sealed and include a certified check or acceptable bid bond of at least five percent of the bid amount. If the bid is accepted, the bidder must execute the contract and provide performance and payment surety bonds equal to one hundred percent of the contract price within ten days after receiving notice of contract award. Bids may not be withdrawn for ninety days after opening. The OUA reserves the right to waive informalities, delete or extend portions of the project, reject any or all bids, and postpone the award for up to sixty days after bid opening.

Sub-Bidding

Water / Sewer

$500,000.00

Public - City

Site Work

10

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
312
Active Projects
125
Bidding Soon
2,114
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 4, 2026

July 6, 2026

Project location map

100 SW 5th Ave, Okeechobee, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.