BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 19, 2026 at 8:00 PM

Updated May 20, 2026

Site work and renovation of a mixed-use development in Oxford, Michigan. Conceptual plans call for the renovation of a playground / park / athletic field.

The Department of Technology, Management and Budget (DTMB) on behalf of Michigan Department of Natural Resources (DNR), is requesting professional engineering services for Phase 100, 200, and 300 services to provide a full engineering and environmental assessment and schematic design of the Polly Ann Trail. The project consists of a 37-mile long trail with 17 miles in Oakland County and 20 miles in Lapeer County, following a previously established railroad grade. The trail in Oakland County has been developed and surfaced but needs rehabilitation. The portion of the trail in Lapeer County needs to be fully evaluated and developed. The scope includes assessing culverts, bridges, road crossings, and active railroad crossings.

Conceptual

Playgrounds / Parks / Athletic Fields

$1,500,000.00

Public - State/Provincial

Renovation, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
423
Active Projects
234
Bidding Soon
2,889
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 18, 2026

January 11, 2027

Project location map

Multiple locations, Oxford, MI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.