Site work and renovation of a water / sewer project in Hilo, Hawaii. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

S50231 - Kawaihae Harbor, Pier 2B, Substructure Repairs, Island of Hawaii The scope of work consists of repairing spalls and delaminations on the substructure at Kawaihae Harbor, Hawaii. The estimated cost of construction is between $500,000 and $700,000. For additional information, contact Branden Sumida, Project Manager, by phone at (808) 587-1873, or by email at branden.sumida@hawaii.gov. Question Deadline 05/29/2026 at 2:00 PM HT - All Request for Information (RFI) questions and Substitution Requests shall be submitted in HIePRO. RFI questions received after the stated deadline shall not be addressed. Substitution Requests received after the stated deadline shall not be considered. Verbal RFI(s) shall not receive a response. All responses to RFI questions shall be provided for clarification and information only and issued by formal addendum. Any amendments to the solicitation shall be made by formal addendum and posted in HIePRO. The State reserves the right to reject any or all proposals and to waive any defects in said proposals in the best interest of the public. HI DOT - Kawaihae Harbor, Pier 2B, Substructure Repairs *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The work to be done under this project includes furnishing of all labor, materials, and equipment necessary to repair substructure spalls and delaminations at Pier 2B at Kawaihae Harbor, Hawaii Island, Hawaii. Bidders are advised to examine the existing conditions at the project site to familiarize themselves with the nature and extent of work involved. Appointments may be made with the State Harbors Maintenance Engineer for clarification of the work involved and the character and quality of materials specified. The work to be done includes, but is not necessarily limited to, the following major items of work: A. Mobilization and demobilization. B. Providing a detailed site specific Best Management Practices (BMP) Plan. C. Performing a Pre-Construction Survey. D. Repair of spalls and delaminations on the concrete substructure and replacement of reinforcing steel as necessary.

GC Bidding

Water / Sewer

$700,000.00

Public - State/Provincial

Renovation, Site Work

12

6

2

2

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
19
Active Projects
7
Bidding Soon
95
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 18, 2026

December 1, 2026

Project location map

2450 Kekuanaoa St, Hilo, HI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.