BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 9, 2026 at 8:00 PM

Updated June 9, 2026

Site work, paving and renovation of a road / highway in Baraboo, Wisconsin. Completed plans call for the renovation of a road / highway; for site work for a road / highway; and for paving for a road / highway.

2026 Street Improvements for the City of Baraboo involving two proposals of street milling, pulverizing, overlaying, reconstruction, and utility work. Bonds: 5% Bid Bond, Certified Check required, 5% Other Bond. The work for which bids are requested includes two (2) individual Proposals: Proposal "A": o Mill and Overlay of approx. 525 feet of Berkley Boulevard from West City limits toward 9th Ave o Mill and Overlay of approx. 1300 feet of Winnebago Circle from Draper St to Draper St o Pulverize and Overlay and Reconstruct approx. 1,600 feet of Amundson Drive from 12th Ave to Madison Ave o Installation of approx. 1,000 lin. Ft. of new Curb & Gutter o Mill and Overlay approx. 1100 feet of Elizabeth Street from 14th Ave to north of 16th Ave o Pulverize and Overlay approx. 1100 feet of 2nd Avenue from Shaw St bridge to Ridge St bridge Proposal "B": o Mill and Overlay of approx. 1200 feet of Washington Avenue from Jefferson St to 10th St o Installation of approx. 3,000 sq. ft. of new Sidewalk o Installation of approx. 300 lin. Ft. of new Curb & Gutter o Mill and Overlay of approx. 700 feet of Washington Avenue from Water St to College Ave o Installation of approx. 1,650 lin. Ft. of new Curb & Gutter o Mill and Overlay of approx. 500 feet of Glenview Drive from College Ave to east end o 1,320 sq. ft. of new construction o Mill and Overlay of approx. 900 feet of 3rd Street from Washington Ave to Lincoln Ave o Mill and Overlay of approx. 2000 feet of Silver Drive from Mine Rd to Walnut St o Mill and Overlay of approx. 2650 feet of Parkside Avenue from Waldo St to Silver Dr o Installation of approx. 600 lin. Ft. of Storm Sewer Question Deadline 05/27/2026 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Tom Pinion, PE, (608) 355-2700 | tpinion@baraboowi.gov

Post-Bid

Roads / Highways

$2,250,000.00

Public - City

Paving, Renovation, Site Work

42

17

4

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
219
Active Projects
118
Bidding Soon
1,767
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 3, 2026

June 16, 2026

Project location map

101 South Boulevard, Baraboo, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.