BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 28, 2026 at 8:00 PM

Updated June 10, 2026

Demolition, site work, paving and new construction of a sidewalk / parking lot in University, Mississippi. Completed plans call for the construction of a sidewalk / parking lot; for the demolition of a sidewalk / parking lot; for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Project involves building demolition and construction of new parking facilities at the University of Mississippi. Bhate Project Number: CSG2026.0001 Project consists of work as described in the Bid Documents to abate and demolish Tad Smith Coliseum on the University, MS campus of the University of Mississippi. The building totals approximately 115,000 square feet of floor area with a footprint of approximately 70,000 square feet. Demolition includes removal of foundations including concrete bell piers, basement walls, cast concrete framing and seating bowl, steel free-span dome roof structure, all other building materials, and selective utility removal and capping. The structure is approximately 75 feet tall above grade to the west to its peak and approximately 90 feet tall above grade to the east. Paving removal, selective tree removal and regrading is also included.

GC Bidding

Sidewalks / Parking Lot

$400,000.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

83

11

3

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
139
Active Projects
86
Bidding Soon
823
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 18, 2026

July 6, 2026

Project location map

100 Coliseum Dr, University, MS

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.