BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 22, 2026 at 8:00 PM

Updated May 23, 2026

Site work for a water / sewer project in Farmington, New Mexico. Completed plans call for site work for a water / sewer project.

DISCLOSURE OF THE MAGNITUDE OF THE CONSTRUCTION PROJECT: The magnitude of this project is between $5,000,000.00 and $10,000,000.00 The principal components of work for NGWSP FCW Reservoir Bypass include, but are not limited to, the following: A. Connect bypass piping to Reach 1 piping and Lake Station Pumping Plant. 1. Water storage tank(s). 2. Water storage tank yard and access road. 3. Wireless control system to communicate water levels of tank(s). B. Pump and piping system to drain reservoir. Remove arroyo embankment east of CR 6800. C. Operation of temporary river pumping system. D. Remove sediment to provide access to morning glory (spillway low-level intake). Work is located east of Frank Chee Willetto Reservoir which is approximately 13 miles east of Shiprock and 13 miles west of Farmington, New Mexico. For information call brittney nielson telephone no 8015243724 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

GC Bidding

Water / Sewer

$10,000,000.00

Public - Federal

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
29
Active Projects
14
Bidding Soon
163
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 2, 2026

August 3, 2026

Project location map

To Be Determined, Farmington, NM

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.