BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 3, 2026 at 8:00 PM

Updated June 4, 2026

Site work and paving for a road / highway in Franklin, Massachusetts. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Contractor Qualification Highway Division Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. This is a corrected version of an ad placed on 4/29/2026 for this Mill and Overlay project. This advertisement corrects the description of limits on each street. In accordance with M.G.L. c. 30, 39M, it is the intention of the Town of Franklin to retain the services of a construction firm for the purposes of constructing approximately 11,500 ft. of roadway milling and paving along Pond Street (#38 to #398), Hilltop Road (Pond Street to past #8), Cottage Street, Peck Street, and Summer Street (King Street to Crocker Avenue) within the Town of Franklin. Bidders must be pre-qualified with MassDOT for Pavement Surfacing for the amount of the Estimated Construction Cost indicated below. The work to be performed will include milling 2" of existing asphalt and repaving with 2" of hot mix asphalt top course, and constructing and repairing concrete pedestrian ramps, with other incidental work as required. Work under this Contract shall be paid for at the contract unit bid prices, which shall constitute full compensation for all material, labor, equipment, etc., required to satisfactorily complete the work. Every request for such interpretation should be in writing addressed to Pam Vickery, Chief Procurement Officer, Municipal Building, 355 East Central St., Franklin, MA 02038 or to email address: (pvickery@franklinma.gov ) to be given consideration must be received at least five (5) days prior to the date fixed for the opening of bids ...the last day for questions will be 10:00 am on Thursday May 7, 2026. The work to be done under this Contract consists of the construction of approximately 11,500 feet of pavement milling and hot mix asphalt paving along Pond Street (#38 to #398), Hilltop Road (Pond Street to past #8), Cottage Street, Peck Street, Summer Street (King Street to Crocker Avenue) within the Town of Franklin. The work to be performed will include pavement milling and hot mix asphalt paving and other incidental work as required. The Project has a 10.4% combined Minority Business Enterprise (MBE) and Women Business Enterprise (WBE) participation goals. See Section 00400 for sample Forms.

Bid Results

Roads / Highways

$1,269,500.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
798
Active Projects
449
Bidding Soon
5,273
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 3, 2026

August 3, 2026

Project location map

Multiple Locations, Franklin, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.