Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published June 22, 2026 at 8:00 PM
Updated July 7, 2026
Remodeling and renovation of a residential development in Milwaukee, Wisconsin. Completed plans call for the remodel of a residential development; and for the renovation of a residential development.
Remodeling and repairs for the STRONG Homes Loan Program project located at 4710 N 91st St. GENERAL 1.1 SUMMARY A. Cut and patch as required to repair damage as listed in the Scope and as specified herein: o Interior plaster or drywall o Stucco o Electrical, plumbing and HVAC openings B. Cut and patch with care to avoid damage to work, safety hazards, violation of warranty requirements, building code violations, or maintenance problems. C. When cutting and patching areas large enough to meet or exceed regulated thresholds, work shall be done in accordance with: o Painted or otherwise coated surfaces shall be done in accordance with Section 01810 Lead Dust Hazards. o Asbestos or asbestos containing material shall be done in accordance with Section 02080 Asbestos Removal. PART 2 - MATERIALS AND PRODUCTS 2.1 MATERIALS A. Match existing materials with new materials so that patching work is consistent with surrounding surfaces. PART 3 - EXECUTION 3.1 INSTALLATION A. Inspect field conditions to identify all work required. B. Perform work with workers skilled in the trades involved. Protect adjacent work from damage and dirt. C. If work will disturb painted or otherwise coated surfaces, install containment measures as outlined in Section 01810 Lead Dust Hazards. D. If work will disturb asbestos or asbestos containing materials, install containment measures as outlined in Section 02080 Asbestos Removal. E. For cutting work, use proper cutting tools, not chopping tools. Make neat holes. Check for concealed utilities and structure before cutting. F. Make patches, seams, and joints durable and consistent with adjacent surfaces. G. Clean work areas and areas affected by cutting and patching operations as outlined in Section 01810 Lead Dust Hazards, Section 02080 Asbestos Removal and Section 01800 Cleaning and Maintenance
Post-Bid
Residential Subdivision
$1,500,000.00
Public - City
Remodeling, Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
15
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 19, 2026
July 18, 2026
4710 N 91ST ST, Milwaukee, WI
Related To This Project
Milwaukee, WI
Bid Date: Jun 05 2026
Milwaukee, WI
Bid Date: Jun 03 2026
Milwaukee, WI
--
Milwaukee, WI
Bid Date: Jun 23 2026
Milwaukee, WI
Bid Date: Jun 16 2026
Milwaukee, WI
Bid Date: Jun 30 2026
Milwaukee, WI
Bid Date: Jun 17 2026
Milwaukee, WI
Bid Date: Sep 07 2026
Milwaukee, WI
Bid Date: Jun 16 2026
Milwaukee, WI
--
Milwaukee, WI
Bid Date: Aug 13 2026
Milwaukee, WI
Bid Date: Jun 05 2026
Milwaukee, WI
--
Milwaukee, WI
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
