Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 29, 2026 at 8:00 PM
Updated May 30, 2026
Remodeling of an educational facility in Murray, Utah. Completed plans call for the remodel of a educational facility.
Reference Number 0000425197 Source ID PU.AG.USA.2756265.2756267.C18581901 Piggyback Contract No The University is entering into a Multi-Step Bidding Process for Construction Services. A short-listing of Contractors will be based on the evaluation of proposals submitted and the selection criteria outlined in the solicitation documents contained herein. Short-listed Contractors will be invited to submit bids on the project. The only Contractors allowed to bid on this project will be Contractors short-listed by the selection committee. All Contractors responding to this procurement must comply with and require all of their Subcontractors to comply with the license laws as required by the State of Utah. The Midvalley Health Center is a five-story medical office building with a penthouse constructed in 2015. The construction services will require renovation of underutilized space and small provider offices into additional exam rooms, and infill the Level 4 Atrium floor to create a central Provider Lounge in the SE corner of Level 3. This will increase the total number of Dermatology Exam rooms by 18. The Midvalley Health Center is an occupied building with active clinical operations in both The Department of Dermatology & The Moran Eye Center. Due to active clinical operations, this project will require the work to be done in phases, to greatly reduce and mitigate impacts on the active clinical operations throughout the building. The recommended phasing has been included in the contract documents. Two phases have been proposed for this project. It is anticipated that work can take place in several areas and on multiple floors at a time during each phase. Reference the contract drawings for the proposed phasing plan. Liquidated Damages: $ 1,000.00 / day The project scope includes: Minor demolition as required Conversion of existing provider offices into (18) new exam rooms Temp removal & reinstallation of the exterior curtain wall system Infill of the multi-story atrium at Level 4, to create additional floor space Mechanical, Electrical, and Plumbing revisions/additions to support the new exam rooms, touch-down rooms, staff break room w/kitchenette, and common circulation areas. Total project will touch approximately 9,500 SF total on level 3, 4, and 5 Question Deadline 06/05/2026 at 4:00 PM MT For questions regarding this project, please contact Krin Kirijas | 804-938-5746 | krin.kirijas@utah.edu. No others are to be contacted regarding this project. A detailed project schedule is required to coordinate with ongoing operations. A preliminary schedule should be submitted with the project qualifications. A detailed schedule from the successful bidder will be reviewed and approved at least 2 weeks prior to mobilization. Design Complete - May 2026 Code Review Complete - June 2026 Bidding by shortlisted GCs: June - July 2026 Construction Start - August 2026 Complete Construction - January 2027 The University of Utah reserves the right to reject any or all bids or to waive any formality or technicality in any bid in the interest of the University.
GC Bidding
Educational
$3,764,552.00
Public - State/Provincial
Remodeling
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 12, 2026
August 3, 2026
243 E 6100 S, Murray, UT
Related To This Project
Murray, UT
Bid Date: Apr 28 2026
Murray, UT
Bid Date: Apr 23 2026
Murray, UT
Bid Date: Apr 30 2026
Murray, UT
Bid Date: Apr 23 2026
Murray, UT
Bid Date: Jun 04 2026
Murray, UT
Bid Date: Jun 09 2026
Murray, UT
Bid Date: Apr 16 2026
Murray, UT
Bid Date: May 05 2026
Murray, UT
Bid Date: Apr 21 2026
Murray, UT
Bid Date: Apr 16 2026
Murray, UT
Bid Date: Mar 30 2026
Murray, UT
Bid Date: Mar 31 2026
Murray, UT
Bid Date: Mar 24 2026
Murray, UT
Bid Date: Mar 12 2026
Murray, UT
Bid Date: Mar 19 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
