BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 11, 2026 at 8:00 PM

Updated June 12, 2026

Site work for a water / sewer project in Sidney, Ohio. Completed plans call for site work for a water / sewer project.

Modification of the Great Miami River water intake dam. Any and all questions regarding the referenced project must be submitted through the Bid Express website no later than 1:00 p.m. (EST) on Monday, June 8, 2026. Questions submitted outside of Bid Express will not be answered. Prevailing Wage: Attention of Bidders is called to all of the requirements contained in the electronic Bid documents, particularly to the Federal Labor Standards Provisions and Davis-Bacon Act. The Contractor is required to comply with all wage and labor provisions and to pay minimum wages in accordance with the prevailing wage determination established by No bidder may withdraw his bid within thirty (30) days after the actual date of the opening thereof. The City of Sidney reserves the right to waive any irregularities, to reject any or all bids, and to award the contract to the bidder deemed to be in the best interest of the City of Sidney. Attention of Bidders is called to all of the requirements contained in the electronic Bid documents, particularly to the Federal Requirements, Federal Labor Standards Provisions and Davis-Bacon Wages, various insurance requirements, various equal opportunity provisions, and requirement for a payment bond and performance bond for 100% of the Contract price. Current Federal regulation (23 CFR 635.410) requires all Bidders for Federal or Federal-Aid contracts to submit Bids based upon using only domestic steel and iron products only. Participation goals for DBE, SBE, MBE, or EDGE have not been established for this project; however, DBEs, SBEs, MBEs, and EDGE Bidders are encouraged to review the project and consider submitting a Bid. All qualified Bidders will receive consideration without regard to race, color, religion, national origin, ancestry, age, sex, sexual orientation, handicap or disability. The Great Miami River Dam Modification Project includes the construction of a rock riffle downstream of a low -head dam and stabilization of the existing dam . The project is in the Great Miami River along Custenborder Park in the City of Sidney , Shelby County , Ohio . Completion- December 31st , 2026

Post-Bid

Water / Sewer

$1,500,000.00

Public - City

Site Work

14

5

7

9

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
230
Active Projects
111
Bidding Soon
2,893
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 11, 2026

August 10, 2026

Project location map

To be Determined, Sidney, OH


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.