Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published June 11, 2026 at 8:00 PM
Updated June 12, 2026
Site work for a water / sewer project in Sidney, Ohio. Completed plans call for site work for a water / sewer project.
Modification of the Great Miami River water intake dam. Any and all questions regarding the referenced project must be submitted through the Bid Express website no later than 1:00 p.m. (EST) on Monday, June 8, 2026. Questions submitted outside of Bid Express will not be answered. Prevailing Wage: Attention of Bidders is called to all of the requirements contained in the electronic Bid documents, particularly to the Federal Labor Standards Provisions and Davis-Bacon Act. The Contractor is required to comply with all wage and labor provisions and to pay minimum wages in accordance with the prevailing wage determination established by No bidder may withdraw his bid within thirty (30) days after the actual date of the opening thereof. The City of Sidney reserves the right to waive any irregularities, to reject any or all bids, and to award the contract to the bidder deemed to be in the best interest of the City of Sidney. Attention of Bidders is called to all of the requirements contained in the electronic Bid documents, particularly to the Federal Requirements, Federal Labor Standards Provisions and Davis-Bacon Wages, various insurance requirements, various equal opportunity provisions, and requirement for a payment bond and performance bond for 100% of the Contract price. Current Federal regulation (23 CFR 635.410) requires all Bidders for Federal or Federal-Aid contracts to submit Bids based upon using only domestic steel and iron products only. Participation goals for DBE, SBE, MBE, or EDGE have not been established for this project; however, DBEs, SBEs, MBEs, and EDGE Bidders are encouraged to review the project and consider submitting a Bid. All qualified Bidders will receive consideration without regard to race, color, religion, national origin, ancestry, age, sex, sexual orientation, handicap or disability. The Great Miami River Dam Modification Project includes the construction of a rock riffle downstream of a low -head dam and stabilization of the existing dam . The project is in the Great Miami River along Custenborder Park in the City of Sidney , Shelby County , Ohio . Completion- December 31st , 2026
Post-Bid
Water / Sewer
$1,500,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 11, 2026
August 10, 2026
To be Determined, Sidney, OH
Related To This Project
Sidney, OH
Bid Date: Jun 30 2026
Sidney, OH
Bid Date: Jun 10 2026
Sidney, OH
Bid Date: Jun 10 2026
Sidney, OH
Bid Date: May 04 2026
Sidney, OH
Bid Date: Jun 04 2026
Sidney, OH
--
Sidney, OH
--
Sidney, OH
--
Sidney, OH
Bid Date: May 05 2026
Sidney, OH
Bid Date: Jun 04 2026
Sidney, OH
Bid Date: Apr 09 2026
Sidney, OH
Bid Date: Apr 02 2026
Sidney, OH
Bid Date: Apr 16 2026
Sidney, OH
Bid Date: Mar 12 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
