Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 21, 2026 at 8:00 PM
Updated May 22, 2026
Site work and paving for a mixed-use development in Boyceville, Wisconsin. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
Sth 170 E to Sth 64 The pavement needs treatment to extend its service life. Perpetuation project to resurface approximately 8.36 miles of STH 79 from STH 170 to STH 64 in Dunn County. Design a 4 inch mill and 4 inch overlay. Additional work includes railroad crossing surface work by railroad company, culvert work (1 replacement, 2 cleaning, 1 extension), adding high friction surface treatment & widening paved shoulders around 2 horizontal curves, inlet repair, adding 2 inlets & storm sewer, spot rehabilitation of guardrail at 2 bridges, pavement markings, and curb ramp upgrades. The pavement resurfacing work will be completed under detour until lower layer is paved and under traffic using lane closures with flagging operation for remainder of work. Railroad crossing work will be done under detour. Temporary pedestrian accommodations required for curb ramp work. Anticipated Construction Cost: $5,000,000-$5,999,999 The Method of Contractor Selection Has Not Been Determined at This Time. WI DOT - RFP Engineering - Menomonie - Connorsville *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Conceptual
Roads / Highways
$5,999,999.00
Public - State/Provincial
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 2, 2026
WI-79, Boyceville, WI
Related To This Project
Boyceville, WI
--
Boyceville, WI
Bid Date: Apr 14 2026
Boyceville, WI
Bid Date: Jan 06 2026
Boyceville, WI
Bid Date: Nov 20 2025
Boyceville, WI
Bid Date: Nov 07 2025
Boyceville, WI
--
Boyceville, WI
Bid Date: Mar 10 2025
Boyceville, WI
Bid Date: Feb 06 2025
Boyceville, WI
--
Boyceville, WI
Bid Date: May 20 2025
Boyceville, WI
Bid Date: Feb 09 2024
Boyceville, WI
Bid Date: Jul 06 2023
Boyceville, WI
Bid Date: Sep 13 2022
Boyceville, WI
Bid Date: May 05 2022
Metomen, WI
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
