BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 23, 2026 at 8:00 PM

Updated May 24, 2026

Site work for a transportation facility in Winnipeg, Manitoba. Completed plans call for site work for a runway / taxiway.

The work involves the reconstruction of existing pavement in areas surrounding the Fort Rouge Garage, specifically northwest of the garage outside the wash bay exit and service bay entrances, as identified in the drawings, with an approximate reconstruction area of 2,000 sq.m. Major components include removal of existing asphalt and concrete pavements and curbs within the prescribed areas, excavation and placement of geotextile fabric, geogrid, sub-base material, and base course material, construction of 180 mm reinforced concrete pavements and concrete curbs. All work must be carried out according to the Construction Staging Plan defined by the Consultant. The funds available for this contract are $650,000. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform. Question Deadline 05/29/2026 All enquiries shall be directed to The Contract Administrator is Sison Blackburn Consulting Inc., represented by: Reynold Cabigting, P.Eng. Senior Civil Engineer Telephone No. 204-451-1417 Email Address rcabigting@sbcinc.ca

Sub-Bidding

Transportation Terminals

$650,000.00

Public - City

Site Work

5

6

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
142
Active Projects
78
Bidding Soon
667
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 5, 2026

June 30, 2026

Project location map

185 King Street, Winnipeg, MB

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.