Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 17, 2026 at 8:00 PM

Updated July 7, 2026

Site work and new construction of a civil project in Casey, Illinois. Completed plans call civil work for a water / sewer project.

Construction of the I-70 Interchange Sanitary Sewer Extension Project. Bidders shall submit all questions to the Engineer in writing via email to Steve Shannon, P.E. (sshannon@hwcengineering.com). B. Questions will be taken until 5:00 PM local time Friday, June 12, 2026. At that time no further questions will be answered, or changes made to the documents. A final addendum, if required, will be issued on Monday, June 15, 2026. Bonds: 5% Bid Bond, Certified Check required, 100% Performance Bond, 100% Payment Bond.

Post-Bid

Water / Sewer

$3,000,000.00

Public - City

New Construction, Site Work

35

13

8

5

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
96
Active Projects
39
Bidding Soon
583
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 17, 2026

August 17, 2026

Project location map

101 W Alabama Ave, Casey, IL


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed