BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 27, 2026 at 8:00 PM

Updated May 28, 2026

Site work and renovation of a water / sewer project in Perryville, Missouri. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

The project consists of furnishing all labor, tools, equipment and materials for site clearing and preparation, excavation, concrete paving for a new roadway extension and apron, type 2 rock blanket, storm sewer structures and piping, rip-rap slope protection, construction of structural steel dolphin mooring structures, restoration of adjacent grades, seeding and mulching and any other associated items to complete the project in accordance with the plans and specifications A certified or cashier’s check or a bid bond in the amount of 5% shall be submitted with each proposal. The project will be awarded to the lowest, responsive, responsible bidder. The Owner reserves the right to waive all informalities, with MoDOT concurrence, not involving price, time or changes in work and to negotiate contract terms with the Successful Bidder. All labor used in the construction of this public improvement shall be paid a wage no less than the prevailing hourly rate of wages of work of a similar character in this locality as established by the Department of Labor and Industrial Relations (Federal Wage Rate), or state wage rate, whichever is higher. Contractors and sub-contractors who sign a contract to work on public works project provide a 10-Hour OSHA construction safety program, or similar program approved by the Department of Labor and Industrial Relations, to be completed by their on-site employees within sixty (60) days of beginning work on the construction project. The right is reserved to reject any or all bids by the New Bourbon Regional Port Authority, with MoDOT concurrence. The DBE Goal for the project is 0.0% No 2nd tier subcontracting will be allowed on this project. The prime contractor must go through MoDOT pre-qualification process and be on the MoDOT approved contractor listing. Question Deadline 06/04/2026 The prime contractor must have a fully responsive contractor questionnaire on file with the Missouri Highways and Transportation Commission (MHTC) at least seven (7) days prior to the date and hour of the bid opening (See Section 102.2 of the Missouri Standard Specifications for Highway Construction, April 1, 2026 Edition). The prime contractor on a project must perform, with its own staff, contract work amounting to NOT less than 30% of the total original contract price. MODOT - New Bourbon Port Harbor Improvements

GC Bidding

Water / Sewer

$15,000,000.00

Public - State/Provincial

Renovation, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
229
Active Projects
125
Bidding Soon
1,466
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 11, 2026

August 17, 2026

Project location map

1 W St Joseph St, Perryville, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.