Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 27, 2026 at 8:00 PM
Updated May 28, 2026
Site work and renovation of a water / sewer project in Perryville, Missouri. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.
The project consists of furnishing all labor, tools, equipment and materials for site clearing and preparation, excavation, concrete paving for a new roadway extension and apron, type 2 rock blanket, storm sewer structures and piping, rip-rap slope protection, construction of structural steel dolphin mooring structures, restoration of adjacent grades, seeding and mulching and any other associated items to complete the project in accordance with the plans and specifications A certified or cashier’s check or a bid bond in the amount of 5% shall be submitted with each proposal. The project will be awarded to the lowest, responsive, responsible bidder. The Owner reserves the right to waive all informalities, with MoDOT concurrence, not involving price, time or changes in work and to negotiate contract terms with the Successful Bidder. All labor used in the construction of this public improvement shall be paid a wage no less than the prevailing hourly rate of wages of work of a similar character in this locality as established by the Department of Labor and Industrial Relations (Federal Wage Rate), or state wage rate, whichever is higher. Contractors and sub-contractors who sign a contract to work on public works project provide a 10-Hour OSHA construction safety program, or similar program approved by the Department of Labor and Industrial Relations, to be completed by their on-site employees within sixty (60) days of beginning work on the construction project. The right is reserved to reject any or all bids by the New Bourbon Regional Port Authority, with MoDOT concurrence. The DBE Goal for the project is 0.0% No 2nd tier subcontracting will be allowed on this project. The prime contractor must go through MoDOT pre-qualification process and be on the MoDOT approved contractor listing. Question Deadline 06/04/2026 The prime contractor must have a fully responsive contractor questionnaire on file with the Missouri Highways and Transportation Commission (MHTC) at least seven (7) days prior to the date and hour of the bid opening (See Section 102.2 of the Missouri Standard Specifications for Highway Construction, April 1, 2026 Edition). The prime contractor on a project must perform, with its own staff, contract work amounting to NOT less than 30% of the total original contract price. MODOT - New Bourbon Port Harbor Improvements
GC Bidding
Water / Sewer
$15,000,000.00
Public - State/Provincial
Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 11, 2026
August 17, 2026
1 W St Joseph St, Perryville, MO
Related To This Project
Perryville, MO
Bid Date: Jun 09 2026
Perryville, MO
Bid Date: Apr 30 2026
Perryville, MO
Bid Date: Jun 05 2026
Perryville, MO
Bid Date: May 07 2026
Perryville, MO
Bid Date: May 15 2026
Perryville, MO
Bid Date: Apr 15 2026
Perryville, MO
Bid Date: Apr 08 2026
Perryville, MO
Bid Date: Apr 02 2026
Perryville, MO
Bid Date: Mar 25 2026
Perryville, MO
Bid Date: Mar 09 2026
Perryville, MO
Bid Date: Mar 17 2026
Perryville, MO
--
Perryville, MO
--
Perryville, MO
--
Perryville, MO
Bid Date: Feb 24 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
