Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 23, 2026 at 8:00 PM
Updated May 24, 2026
Site work and new construction of a mixed-use development in Aubrey, Texas. Completed plans call for the construction of a 2,400-square-foot office development; 13,440-square-foot industrial development; industrial development; and for site work for a industrial development.
Construction of a high-performance Pre-Engineered Metal Building (PEMB) measuring 168 ft by 80 ft at Mustang SUD headquarters. The facility is to combine industrial-scale functionality with high-efficiency conditioned spaces in full compliance with 2021 IECC (Climate Zone 3) energy standards. The building will feature a durable 26-gauge PBR metal enclosure, drive-through bays, and semi-heated shop space. The bay areas will include four general mechanical bays, two painting bays, areas for tires, parts, and fabrication, and overhead doors. There will also be a large enclosed covered area. The project includes a conditioned pod for office space and locker rooms (30 ft by 80 ft) that will be thermally isolated. Additional details regarding plumbing, fixtures, HVAC, and building requirements are included in the preliminary drawings referenced in the 10% Technical Memorandum. The work includes site civil, electrical, and related work.
GC Bidding
Industrial
$5,000,000.00
Public - County
New Construction, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 16, 2026
July 31, 2026
To be determined, Aubrey, TX
Related To This Project
Aubrey, TX
--
Aubrey, TX
--
Aubrey, TX
--
Aubrey, TX
Bid Date: Apr 16 2026
Aubrey, TX
Bid Date: Apr 22 2026
Aubrey, TX
--
Aubrey, TX
--
Aubrey, TX
--
Aubrey, TX
Bid Date: May 05 2026
Aubrey, TX
--
Aubrey, TX
--
Aubrey, TX
Bid Date: May 27 2026
Aubrey, TX
--
Aubrey, TX
Bid Date: Apr 21 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
