BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 15, 2026 at 8:00 PM

Updated June 16, 2026

Site work for a development in Lansdale, Pennsylvania. Completed plans call for site work for a development.

In general, the work consists of, but is not limited to: site clearing, gravel bar and sediment removal, grading of the streambanks, streambank stabilization with coir logs, installation of permanent 100% biodegradable stabilization matting, landscaping, rock vane installation and erosion and sediment controls as required to complete the proposed improvements. Question Deadline 06/08/2026 at 5:00 PM ET Online Site Location A. The project site is in the Borough of Lansdale, Montgomery County, Pennsylvania. B. The streambank restoration activities will be performed on an unnamed tributary to the West Branch Neshaminy Creek that runs behind the Borough of Lansdaleís Wastewater Treatment Plant at 652 W. 9 th Street. The project site is located fully within the bounds of parcels owned by the Borough of Lansdale. 1.02 Project Description A. In general, the work consists of, but is not limited to: site clearing, gravel bar and sediment removal, grading of the streambanks, streambank stabilization with coir logs, installation of permanent 100% biodegradable stabilization matting, landscaping, rock vane installation and erosion and sediment controls as required to complete the proposed improvements. The scope of work is more fully described in the Project Specifications herein and on the Project Plans. B. The Contractor must adhere to all terms and provisions set forth within the grant contracts included in this bid package. This Project was financed in part by the following: a. Flood Mitigation Program from the Commonwealth of Pennsylvania, Department of Community and Economic Development (Contract No. C000092853); b. Pennsylvania Infrastructure Investment Authority (PENNVEST). 1.03 Work Included A. Base Bid 1. Mobilization. The contractor shall supply the required insurance, performance and payment bonds. The contractor shall mobilize the project site and commence construction. 2. Temporary Soil Erosion & Sediment Controls. Install stabilized construction entrance and other temporary soil erosion and sediment control measures as described on the project plans. 3. Site clearing. Perform site clearing as necessary to facilitate proposed streambank stabilization, proposed grading, removal of designated trees and sediment. Site clearing sh

Post-Bid

Conservation and Development

$500,000.00

Public - City

Site Work

15

19

11

6

Subscribe For Documents

53 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1,066
Active Projects
485
Bidding Soon
7,823
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 15, 2026

July 1, 2026

Project location map

652 W 9th St, Lansdale, PA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.