Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published June 15, 2026 at 8:00 PM
Updated June 16, 2026
Site work and new construction of a water / sewer project in Maple River Township, Michigan. Completed plans call for site work for a water / sewer project.
Construction of a 360 gpm packaged water treatment system. The Project includes the construction of a 360 GPM packaged water treatment system generally consisting of the following items: o Four (4) submersible well pumps each rated for 120 GPM at 69' TDH One well has been installed, the other three will be drilled as part of this project. o A masonry building housing a packaged water treatment system o High service effluent pumps o Ductile iron piping and valves o Bulk chemical storage o Chemical feed equipment o HVAC equipment including dehumidification o Multi-Use and office area o Bathroom facilities o Electrical room and exterior backup generator o Instrumentation and Controls o SCADA equipment o Sludge and backwash water infiltration lagoons o Septic system Site improvements o Ancillary items to provide a completely functioning system. The Contractor shall have control over the sequence and order of execution of Work. A suggested sequence of work is specified in section 01 10 00, paragraph 1.9 of the project manual. There is pilot testing work required for confirmation of the package water treatment system to be performed at the forefront of the project. Concurrent work: Cooperate with other Contractors in the vicinity of this Contract's construction limits such that operations of one Contractor does not interfere with another. o Distribution System: Distribution piping installation will be installed at the effluent of this contracts limits. This project includes allowances for several items: o Upgrade Electrical Service (Consumers) o Natural Gas Service (DTE) o SCADA (ICI) o Permit Allowance o Security System C. Additional Clarifications All equipment and material submittals shall be approved. Q&A 06/09/2026 at 5:00 PM ET Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. OHM Advisors: Jennifer Drinan, P.E. Email: jennifer.drinan@ohm-advisors.com B. OHM Advisors: Matt Kennedy, P.E. Email: matt.kennedy@ohm-advisors.com Questions received less than seven days prior to the date for opening of Bids may not be answered.
GC Bidding
Water / Sewer
$3,000,000.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 1, 2026
October 29, 2026
E Robinson Rd, Maple River Township, MI
Related To This Project
Maple River Township, MI
Bid Date: May 07 2024
Maple River Township, MI
Bid Date: Mar 15 2022
Marine City, MI
Bid Date: Jun 23 2026
Mackinaw City, MI
Bid Date: Jun 23 2026
Pontiac, MI
Bid Date: Jun 22 2026
Flint, MI
Bid Date: Jul 15 2026
Negaunee, MI
Bid Date: Jun 08 2026
Midland, MI
Bid Date: Jun 16 2026
Mount Morris, MI
Bid Date: Jun 22 2026
Canton, MI
Bid Date: Jun 04 2026
Lincoln Park, MI
Bid Date: Jun 24 2026
Lincoln Park, MI
Bid Date: Jun 24 2026
Chesterfield, MI
Bid Date: Jun 16 2026
Troy, MI
Bid Date: Jun 16 2026
Traverse City, MI
Bid Date: Jun 11 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
