BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 9, 2026 at 8:00 PM

Updated June 11, 2026

Site work and renovation of a water / sewer project in Howard City, Michigan. Completed plans call for the renovation of a 3,830-square-foot, one-story above grade water / sewer project.

Question Deadline 06/12/2026 All questions about the meaning or intent of the Bidding Documents are to be submitted to CM in writing. Questions received less than ten (10) days prior to the date for opening Bids may not be answered. The Project includes upgrades to the Wastewater Treatment Plant ( WWTP) and multiple lift stations within the collection system . At the WWTP, improvements consist of adding tertiary treatment facilities with rapid mix and flocculation basins, enhancing chemical feed systems, abandoning the existing rapid infiltration basins ( RIBS ), removing accumulated sludge , and completing all associated electrical and piping upgrades. Additional work within the collection system includes converting Lift Station No. 1 from a can style station to a submersible station, along with pump replacements and control system enhancements. Improvements at Lift Station No. 3 include replacement of the wet well hatch, valve replacements, and updated controls, while Lift Station No. 4 will receive new pumps and valves, valve chamber casting replacement, and electrical and control upgrades, and all related work. Upgrades to the Wastewater Treatment Plant (WWTP) and multiple lift stations within the collection system. WWTP improvements consist of adding tertiary treatment facilities with rapid-mix and flocculation basins, enhancing chemical feed systems, abandoning existing rapid infiltration basins (RIBs), removing accumulated sludge, and associated electrical and piping upgrades. Collection system work includes converting Lift Station No. 1 from a can-style to a submersible station, pump replacements, and control system enhancements. Lift Station No. 3 improvements include wet-well hatch and valve replacements and updated controls. Lift Station No. 4 improvements include new pumps and valves, valve chamber casting replacement, and electrical and control upgrades. The following construction contracts will be awarded separately or together in any combination: Contract No. and Identification 1 Site Work & Excavation 2 General Trades 3 Painting 4 Mechanical 5 Biosolids Removal 6 Electrical, Controls & Instrumentation

Sub-Bidding

Water / Sewer

$1,500,000.00

Public - City

Renovation, Site Work

58

29

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
112
Active Projects
65
Bidding Soon
1,085
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 22, 2026

November 1, 2026

Project location map

125 E Shaw St, Howard City, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.