Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 23, 2026 at 8:00 PM
Updated May 24, 2026
Demolition, site work, paving and new construction of a mixed-use development in Thornton, Colorado. Conceptual plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
The York Street Phase III Project proposes comprehensive roadway and bridge improvements along approximately two miles of York Street between East 58th Avenue and East 74th Avenue (State Highway 224) in Adams County, Colorado. The scope includes widening and reconstructing the roadway to provide two travel lanes in each direction with a center turn lane, new turn lanes at intersections, a shared-use path on the east side, sidewalks on the west side, upgraded drainage and water quality facilities, lighting, curb ramps, and enhanced pedestrian crossings. The project also includes replacement of the Clear Creek bridge and the Union Pacific Railroad bridge over York Street, with the goal of improving safety, capacity, multimodal mobility, and stormwater management along a critical county corridor. Informational Coverage: This project receives automated updates from sources only and will not be actively tracked by our Content team. Information is provided as-is for planning awareness. Should you wish to provide information on this project or are seeking an update, please email contentcase@constructconnect.com.
Conceptual
Bridges / Tunnels
$150,000,000.00
Public - County
Demolition, New Construction, Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 4, 2027
York St, Thornton, CO
Related To This Project
Thornton, CO
Bid Date: Jun 09 2026
Thornton, CO
Bid Date: May 01 2026
Thornton, CO
Bid Date: Jun 17 2026
Thornton, CO
Bid Date: Jun 24 2026
Thornton, CO
--
Thornton, CO
--
Thornton, CO
Bid Date: Jun 01 2026
Thornton, CO
Bid Date: May 12 2026
Thornton, CO
Bid Date: May 22 2026
Thornton, CO
Bid Date: Mar 27 2026
Thornton, CO
Bid Date: Apr 15 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
