BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 29, 2026 at 8:00 PM

Updated May 30, 2026

Site work and new construction of a bridge / tunnel in Smithers, British Columbia. Completed plans call for site work for a bridge / tunnel.

Works include but not necessarily limited to: Site preparation including mobilization, preparation and installation of detour structure,of Survey layout, traffic management, qualitiy management, removaland detour structure, removal of existing Foss Bridge, installation of riprap slope protection, bridge installation including rock socketed piled abutment an cast inplace concrete rock pad, reconstruction of bridge approaches and associated paving, removalof detour bridge, revegetation a, demobolizations, demobilization and site cleanup pilled abutment and cast in place conceret rock pad, reconstruction of bridge approaches and associated paving, removal of detour structure, revegetation and demobilization. Work also includes traffic, quality, and environemental ,management. Project Location: Driftwood Rd, approx 11km east of Smithers, BC Driftwood Rd, east of Smithers, crossing Driftwood Creek, approximately 10 km from Hwy 16 and 1.87 km east of the intersection at Telkwa High Road. Documents can be obtained from www.bcbid.gov.bc.ca. Construction documents for this project are copyright of the Province of British Columbia. This estimate was not prepared or reviewed by the Government of British Columbia and as such, the Government of British Columbia is not responsible for it in any way. You are solely responsible for ensuring, to your satisfaction, that the information in this estimate is accurate, reliable, correct and suitable for your purpose. Question Deadline 06/18/2026 at 4:00 PM Please direct all project specific enquiries related to this RFx by email to Lisa Amminson Email Address: lisa.amminson@parsons.com

GC Bidding

Bridges / Tunnels

$1,000,000.00

Public - State/Provincial

New Construction, Site Work

27

14

2

2

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
2
Active Projects
0
Bidding Soon
16
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 30, 2026

August 1, 2026

Project location map

Driftwood Rd, Smithers, BC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.