BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 25, 2026 at 8:00 PM

Updated May 26, 2026

Demolition and site work for a bridge / tunnel in Sunrise, Florida. Completed plans call civil work for a bridge / tunnel.

The project is located within the 496 acre CITY OF SUNRISE DRAINAGE BASIN 15, bordered on the south by NW 44th Street, on the north by Commercial Boulevard, on the west by the South Florida Water Management District C-42 Canal and a portion of the Sawgrass Expressway, and on the east by Nob Hill Road. The culvert reinforcement work is located at the Hiatus Road canal crossing between NW 53rd Street and NW 55th Street in the City of Sunrise. The City has instituted an overall project for roadway culvert replacements or reinforcement within Basin 15, which includes this project. The work consists of the installation of a 54” reinforced concrete pipe (RCP) parallel to the existing 54” RCP culvert, and rerouting existing street drainage. The parallel pipe and replacement section are intended to upgrade the hydraulic flow capacity of the culvert crossing to that of a single 72” RCP. The existing canal culvert is designated as Culvert R-15-110A. The work includes sediment and turbidity control, pollution prevention, clearing and grubbing, maintenance of traffic, dewatering, canal bypass pumping, installing 54” RCP, construction of two endwalls and two manhole structures, connecting to existing street drainage pipe, demolition, restoration of pavement and curbs, pavement milling and resurfacing, restoration of pavement markings, sodding, and other miscellaneous and incidental items for a complete project. The contractor is responsible for preparation of as-built record drawings.

Sub-Bidding

Bridges / Tunnels

$500,000.00

Public - City

Demolition, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
272
Active Projects
137
Bidding Soon
2,144
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 25, 2026

August 9, 2026

Project location map

Hiatus Road canal crossing between NW 53rd Street and NW 55th Street, Sunrise, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.