BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 27, 2026 at 8:00 PM

Updated May 28, 2026

New construction of a water / sewer project in Raleigh, North Carolina. Completed plans call for the construction of a water / sewer project.

The overall Project objective is to construct the identified solids treatment improvements at the McAlpine Creek Wastewater Management Facility (WWMF) to generate a Class A biosolids product including planned regionalization of solids treatment from the Irwin Creek Wastewater Treatment Plant (WWTP) and future Stowe Regional Water Resource Recovery Facility in addition to existing regionalization with the Sugar Creek WWTP. The McAlpine Creek Wastewater Management Facility Thermal Hydrolysis Process and Biosolids Improvements - Phase 1 Project includes implementation of new solids treatment unit processes as well as upgrades to existing unit processes including but not limited to the following key components: -Pre-Dewatering Building housing sludge screens (to be pre-selected by the Owner), pre-dewatering centrifuges (to be pre-selected by the Owner), polymer systems, dewatered sludge cake bins and sludge pumping equipment along with electrical and control rooms. - Screened sludge storage tanks. -THP Process Equipment as furnished by CAMBI who was selected via a competitive procurement process in 2021 for a defined scope of supply. -Improvements to the existing Anaerobic Digester complex including new steam boilers. -Cooling system for thermally hydrolyzed sludge, including new sludge recirculation system for the anaerobic digesters. -Replacement of the odor control facility for the North Plant, including new infrastructure that will service the new Pre-Dewatering Building. -Electrical distribution system and standby power generation improvements. The following Bid Packages are currently out to bid for the Early Work Package: Bid Package 01.01 Settlement Monitoring/Noise/Vibration Bid Package 01.02 Land Surveying Bid Package 02.01 Early Site Work Bid Package 02.02 SOE Wall Bid Package 03.01 Early Rebar Submittals and Shop Drawings Bid Package 11.01 Pre-Watering Solids Screening Equipment-Huber Sole Sourced Bid Package 11.02 Progressive Cavity Pumps-See specs for named Suppliers Bid Package 11.03 Cooling Towers Bid Package 11.04 Centrifuges-Alfa Laval Sole Sourced Bid Package 11.05 Sludge Heat Exchangers Bid Package 11.06 Thermal Hydrolysis Process-Cambi Sole Sourced Bid Package 11.07 Stainless Steel Polymer Tanks-See specs for named Suppliers Bid Package 11.08 Cake Silos-See specs for named suppliers Bid Package 11.09 Odor Control Systems-See specs for named Suppliers Please note, the City of Charlotte has an "Approved Contractor List". If you aren’t currently on this list, you must fill out a Charlotte Water Security Agreement and return to Melinda Lindsay @ mlindsay@pcconstruction.com asap please. You will then be given a link to view all bid documents via the PC Plan room. Please note once you’re on the Approved Contractors List, you’re good for 5 years from the date you’ve signed this agreement. If you’re already on this listing, please send an email to Melinda Lindsay advising such and the link will be provided to you. Additional Details: Bid Date-June 24th, 2026 @ 2:00 PM, *PC Provided Bid Forms only must be utilized and must confirm receipt of all addenda issued. Confirm intent to bid-June 1st, 2026 RFIs due no later than June 15th,2026 end of day Pre-Bid Non-Mandatory Virtual-May 27th,2026, details to be provided soon Site Visit Non-Mandatory-May 28,2026 @ 10:30 AM at McAlpine Plant-12701 Lancaster Hwy, Pineville, NC 28134, must have all PPE and park to the right in the trailer parking area. 120 Day bid validity period 7% CBI M/WBE Participation Goal (must be on the Charlotte CBI Listing) All Subcontract packages will require a Good Faith Effort to be completed and submitted with your bid. *Please note Supply Bonds will be required for any equipment/materials over $250k *All Subcontractors must be prequalified with PC Construction prior to a contract award for any packages over $25,000.00. *There is a 7% CBI M/WBE Good Faith Effort required for this Early Work Package, Subcontractors are required to reach out to CBIs as a part of this effort to carry out smaller portions of the work, i.e. trucking, Port O lets, Dumpster Rentals, etc.

Sub-Bidding

Water / Sewer

$14,145,000.00

Public - County

New Construction

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
248
Active Projects
124
Bidding Soon
2,463
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.