Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 10, 2026 at 8:00 PM

Updated September 15, 2026

Site work and new construction of a water / sewer project in Woodland, California. Completed plans call civil work for a wastewater treatment plant.

REQUIRED SERVICES a. Perimeter Misting System The Contractor shall provide approximately 4,000 linear feet of perimeter misting infrastructure, divided into appropriate operational zones. The system shall include, at a minimum: i. High-pressure pump system capable of providing consistent operating pressure suitable for perimeter misting applications. The system shall allow adjustment of system pressure or flow to optimize droplet size, coverage, and chemical application rates. Variable frequency drives (VFD) or other pressure control methods may be proposed. ii. Filtration and chemical injection system including water filtration appropriate to minimize nozzle clogging and ensure reliable long-term operation. iii. Nozzle assemblies designed for effective droplet size and distribution iv. Control panel v. Capability to receive external control signals or integrate with weather station data to support automated activation based on wind conditions or County odor risk monitoring. vi. Electrical requirements clearly defined vii. All mounting hardware and necessary fittings viii. Spare parts, such as spare nozzles, recommended for the first year of operationb. The system shall not rely on proprietary odor counteractant products and must be capable of operating with commercially available odor counteractant products from multiple vendors. c. Odor Counteractant Consulting The Contractor shall provide the following consulting services regarding selection and dosing rate for the proposed product: i. The odor counteractant product recommended for Yolo County Central Landfill and confirmation that it meets the requirements set forth in Section 3 Odor Counteractant Chemistry. ii. Recommended site specific dosing rate based on high-risk meteorological conditions iii. Alternative odor counteractant products carried by vendor that meet the requirements set forth in Section 3 Odor Counteractant Chemistry. iv. Proposal shall include sufficient odor counteractant to run the system during the 60- day performance testing period. Purchase of odor counteractant beyond the 60-day performance period will be under a separate contract. d. Smart Control Integration The system shall: i. Accept external digital input or dry contact signal ii. Allow programmable ON/OFF control iii. Integrate with County odor risk dashboard logic iv. Allow wind-based shutdown logic Question Deadline 06/11/2026 4:00 PM via online. The following RFP Coordinator shall be the main point of contact for this RFP: County of Yolo Department of General Services 120 W. Main St. Ste.C Woodland, Ca 95695 Phone: (530)406-4874 Alejandro.sanchez@yolocounty.gov Awarded company -Weaver Odor Solutions, LLC

Award

Water / Sewer

$150,000.00

Public - County

New Construction, Site Work

5

2

2

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
425
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 16, 2026

August 17, 2026

Project location map

44090 Co Rd 28H, Woodland, CA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed