BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 28, 2026 at 8:00 PM

Updated May 29, 2026

Site work and new construction of a transportation facility in Orlando, Florida. Conceptual plans call for the construction of a transportation facility; and for site work for a transportation facility.

A detailed scope has not yet been determined : Project is in Greater Orlando Aviation Authority (GOAA) capital budget fy 2025 -2030 CIP page no : 2 ____________________________________________________________________________________ The Aviation Authority is seeking a qualified Program Management and Construction Management (PMCM) Services Consultant to manage and oversee the Airside 2 Wing Expansion Program at Orlando International Airport. The scope includes comprehensive design and construction program management of assigned programs and projects, proactive identification and resolution of issues affecting operations, schedules, budgets, and risks, as well as advisory support for best practices. Services include program management, stakeholder and operations coordination, design management, construction management, contracts management, and other duties as required. The program involves the delivery of up to nine additional aircraft gates, relocation of existing gates, and the associated infrastructure improvements such as apron reconstruction, taxiway modifications, lighting, drainage, fueling systems, and facilities for ground service equipment. The PMCM team will work closely with Aviation Authority staff and other stakeholders as part of an Integrated Program Team, and must have experience with airport projects of similar scope and complexity, including alternative construction delivery methods. Instructions to bidders include submitting a response through the designated electronic e-Procurement Platform, providing all requested documentation, certifications, and narrative responses as specified, and ensuring all files are in PDF format. Responses must demonstrate compliance with all minimum requirements and include detail on qualifications, staffing, program approach, and experience. Late submissions and submissions by email, hard copy, or fax will not be accepted. Only one response per Respondent is allowed. Respondents should address all items in the Vendor Questionnaire and not include links or images in narrative fields, as these will not be reviewed. All communications regarding the solicitation must occur via the e-Procurement Platform. Respondents must also meet insurance and business requirements and demonstrate good faith efforts regarding small and disadvantaged business participation if applicable. All submitted materials become the property of the Aviation Authority, subject to public records law. Question Submission Deadline:June 8, 2026, 12:00pm

Conceptual

Transportation Terminals

$374,000,000.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
400
Active Projects
180
Bidding Soon
2,978
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 24, 2026

June 1, 2027

Project location map

11344 Terminal C Service Road, Orlando, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.