BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 11, 2026 at 8:00 PM

Updated June 12, 2026

Site work and paving for a civil project in Colorado Springs, Colorado. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Reference Number 0000425590 El Paso County is soliciting bids from qualified, experienced, professional Contractors to furnish all materials, labor and equipment necessary for the Deer Creek Road, Base Camp Road, Microscope Way Project, which generally includes construction of stormwater improvements across multi-jurisdictions. General Requirements - Bid Deposit Required - Insurance Required Question Deadline 06/05/2026 at 10:00 AM MT Questions are submitted online via the Rocky Mountain EPurchasing system Project has a 0% DBE goal The proposed Project includes improvements consisting of roadway and drainage improvements along Deer Creek Road, Base Camp Road, and Microscope Way. Work includes intersection improvements at Deer Creek Road and Woodmoor Drive, including the construction of a roundabout. Drainage improvements include improvements to open systems along roadways as well as an upgrade to a box culvert at the Crystal Creek crossing along Deer Creek Road. All work shall be performed within El Paso County right-of-way (EPC ROW). Staging and stockpiles shall be within EPC ROW unless written permission is obtained from property owner(s). The Project requires close collaboration and/or coordination with affected utility providers during construction which include but are not limited to: Black Hills Energy (underground gas), Mountain View Electric Association (underground electric), Woodmoor Water & Sanitation District (WWSD water & wastewater) and multiple fiber TV/telecommunication (Lumen, Comcast, Verizon). WWSD is concurrently advertising a separate IFB to accomplish required relocation work within the Project limits. The project alignment location is shown in Figure 1. Roadway, Stationing & Length: Base Camp Road Station 100+00 to Station 107+80, approximately 0.15 miles Microscope Way Station 200+00 to Station 207+00, approximately 0.13 miles Deer Creek Road Station 400+00 to Station 420+20, approximately 0.38 miles Woodmoor Drive Station 300+85 to Station 304+90, approximately 0.08 miles Major Roadway Structures: Crystal Creek CSP Intersections: Deer Creek Road/Base Camp Road, Deer Creek Road/Microscope Way, Deer Creek Road/Woodmoor Drive Drainageways: Crystal Creek County: El Paso County Legal Description: The Project limits lie within the NE1/4 of the SW1/4 of Section 11, Township 11 South, Range 67 West of the 6th Principal Meridian.

GC Bidding

Water / Sewer

$300,000.00

Public - County

Paving, Site Work

228

6

2

4

Subscribe For Documents

81 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 24, 2026

July 21, 2026

Project location map

Multiple Locations, Colorado Springs, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.